Beta testing is:

  • the act of implementing a new idea, system or product on a large scale, controlled environment within the entire organization.
  • the act of implementing a new idea, system, or product within a controlled environment.
  • All of the above
  • None of the above

Scrum is used:

  • When teams want to create new technical products
  • When teams want to integrate new developments on existing products within a short time frame
  • All of the above
  • None of the above

The Motorola company is credited with:

  • the origin of the Plan-Do-Check-Act model.
  • the origin of the Toyota Production System.
  • the origin of the Six Sigma Methodology.
  • All of the above.

Which of the following is NOT a common misconception of the Six Sigma Methodology?

  • Six Sigma can fix anything.
  • Six Sigma is too expensive.
  • Six Sigma is concerned with metrics and ignores common sense.
  • Six Sigma aims to reduce defects in hopes of increasing profitability.

Which of the following is NOT an end goal of BOTH quality improvement programs and continuous process improvement?

  • Achieving a specific set goal
  • Reducing errors and defects
  • Improving efficiency
  • Improving profits

Lean principles often:

  • contradict Six Sigma principles.
  • go hand-in-hand with Six Sigma principles.
  • all of the above
  • none of the above

A Value Stream:

  • is the sequence of all items, events and people required to produce an end result.
  • is used to identify areas of concern, waste, and improvement.
  • Neither A nor B
  • Both A and B

Which of the following is NOT an example of a common challenge of the Six Sigma Methodology within an organization?

  • lack of support
  • poor project execution
  • excess resources
  • lack of access to data

Which of the following is NOT a similarity between Lean and Six Sigma concepts?

  • They are both concerned with continuous improvement.
  • They both seek to increase instances of waste within an organization.
  • They are both concerned with an overall culture of quality rather than single events that increase quality and decrease defects.
  • None of the above

Which of the following shows phases of the Rummler-Brache Method in the correct order?

  • Definition, Implementation, Improvement Planning, Management of Process
  • Definition, Improvement Planning, Implementation
  • Improvement Planning, Definition, Analysis and Design, Implementation, Management of Process
  • Definition, Improvement Planning, Analysis and Design, Implementation, Management of Process

Which of the following is NOT a key element of TQM (Total Quality Management) initiatives?

  • Teamwork
  • Ethics
  • Integrity
  • Ingenuity

A Six Sigma level is calculated by which of the following equations:

  • (Opportunities + Defects)/Opportunities x 100
  • (Defects – Opportunities)/Defects x 100
  • (Defects + Opportunities)/Defects x 100
  • (Opportunities – Defects)/Opportunities x 100

Errors and costs ________ as sigma levels ________.

  • increase, increase
  • increase, decrease
  • decrease, decrease
  • None of the above

A process that performs at a 6 sigma level:

  • is considered statistically ‘perfect’
  • has 3.4 defects per million opportunities
  • operates at a 99.99966% accuracy
  • all of the above

Which of the following is NOT a component of Six Sigma Yellow Belt Training?

  • Advanced Project and Team Management Skills
  • Data collection
  • Basic Quality Tools
  • Six Sigma Roles

Order the correct steps of the Deming Cycle:

  • Plan, Do, Check, Act
  • Plan, Act, Do, Check
  • Act, Do, Check, Plan
  • Plan, Check, Do, Act

Which of the following is considered the father of Six Sigma?

  • Jack Welch
  • Mikel Harry
  • Richard Schroeder
  • Bob Galvin

Six Sigma:

  • ultimately reduces process costs
  • is a methodology for process improvement
  • is a statistical concept that seeks to find variation in processes
  • All of the above

According to the TQM mentality, the entire organization is only as strong as the ________ element.

  • strongest
  • weakest
  • least productive
  • most productive

Which of the following is NOT a continuous process improvement technique?

  • Six Sigma Methodologies
  • Lean
  • TQM (Total Quality Management)
  • BPR (Business Process Reengineering)

Which of the following correctly orders the Six Sigma Certification Belt levels from lowest to highest?

  • Green, Master Black, Yellow, White
  • Master Black, Black, Green, Yellow, White
  • White, Yellow, Green, Black, Master Black
  • White, Yellow, Black, Master Black, Green

Which of the following methods seeks to effect positive change in processes and organizations by using a set of practical tools to address business issues and process problems?

  • BPR (Business Process Reengineering)
  • TQM (Total Quality Management)
  • Lean or Six Sigma Methodologies
  • This statement can apply to more than one of the above.

The statistical difference between a process operating at a 5 sigma level and a process operating at a 6 sigma level is:

  • markedly different when it comes to the number of defects present.
  • not markedly different when it comes to the number of defects present.
  • All of the above
  • None of the above

Jumpstart is:

  • a lengthy process for identifying problems and solutions in multiple sessions that can be used within other methods such as Rummler-Brache, Scrum, and TQM.
  • a fast-paced method for identifying problems and solutions in a single session that can be used within other methods such as Rummler-Brache, Scrum, and TQM.
  • All of the above
  • None of the above

Six Sigma Teams use the ________ method when improving a product or process that already exists, and the ________ method when developing a new product or process.

  • DMAAC, DMAAV
  • DMAAV, DMAAC
  • DMAIC, DMADV
  • DMADV, DMAIC

When prioritizing Six Sigma projects within an organization:

  • The project with the statistically lowest sigma level should always be prioritized
  • The project with the highest potential cost savings should always be prioritized.
  • The project with the highest potential customer satisfaction increase should always be prioritized.
  • All of the above should be considered and statistically researched before choosing the best option for the organization at hand.

An organization that fully adopts the Six Sigma methodology:

  • completes a few Six Sigma Projects and reaps the financial benefits
  • continuously measures and improves processes indefinitely
  • improves upon a few processes then moves on
  • identifies and prioritizes areas of opportunity once or twice a year

Which of the following Belt Levels usually require a Six Sigma Project to be completed before a Six Sigma Certification is awarded?

  • White and Yellow Belts
  • Yellow and Green Belts
  • Green and Black Belts
  • All of the above

Data driven processes:

  • are heavily based on intuition
  • rely heavily on the experience of the process owners
  • are based on statistical data, measurement and metrics
  • do NOT rely on mathematical models

The Six Sigma process improvement method should be chosen when:

  • facing a known problem
  • problems are defined and contained
  • solving complex problems
  • costs are loosely tied to processes

About Clear My Certification

Check Also

CyberSecurity Tech Mahindra Foundation - Skill India Digital Hub Assessment Exam Answers

CyberSecurity Tech Mahindra Foundation – NSDC Skill India Digital Hub Assessment Exam Answers

CyberSecurity Tech Mahindra Foundation – Skill India Digital Hub Assessment Exam Answers Assessment- Section 2 …

Leave a Reply

Your email address will not be published. Required fields are marked *