Wednesday , November 18 2026
Breaking News

PLC Programming Certiication Exam Answers 2026 (All 100 Questions)

PLC Programming Certiication exam answers 2026: This page lists all 100 questions of the official PLC Programming Certiication exam by Itronix Solutions, each with its four answer options and the correct answer highlighted in green. Use it to revise every topic before you attempt the test and earn your verifiable certificate.

About this certification: Ladder Logic is the most common language used in PLC programming. It was developed to mimic relay logic, that is why the syntax is very simple.

Certification PLC Programming Certiication
Provider Itronix Solutions
Category Engineering & CAD
Total questions 100 multiple-choice questions
Marks 1 mark per question (100 marks)
Passing score 80% (80 out of 100)
Retake Available if you do not pass
Certificate Verifiable online certificate

Take the exam: PLC Programming Certiication on Itronix Solutions. See every other Itronix exam in our complete list of Itronix certification answers.

PLC Programming Certiication Exam Questions and Answers

Questions 1 to 25

1. Ladder logic programming consists primarily of:

A. Virtual relay contacts and coils ✔
B. Logic gate symbols with connecting lines
C. Function blocks with connecting lines
D. Text-based code

Correct answer: A. Virtual relay contacts and coils

2. In a PLC, the scan time refers to the amount of time in which …..

A. the technician enters the program
B. timers and counters are indexed by
C. one “rung” of ladder logic takes to complete
D. the entire program takes to execute ✔

Correct answer: D. the entire program takes to execute

3. The difference between online and offline PLC programming is . . .

A. where the edited program resides ✔
B. whether the programming PC has internet connectivity
C. the type of programming cable used
D. whether the PLC is running or stopped

Correct answer: A. where the edited program resides

4. In PLC programming, a retentive function is one that:

A. Defaults to the “on” state
B. Defaults to the “off” state
C. Is not reset after a power cycle ✔
D. Cannot be edited or deleted

Correct answer: C. Is not reset after a power cycle

5. What is the primary purpose of a PLC?

A. To control machinery on factory assembly lines
B. To control building management systems
C. To control industrial processes
D. All of the above ✔

Correct answer: D. All of the above

6. What type of programming language is typically used to program a PLC?

A. C++
B. Java
C. Ladder Logic ✔
D. Python

Correct answer: C. Ladder Logic

7. How many maximum input and output points does a high-end PLC have?

A. 16 input, 16 output
B. 8 input, 8 output
C. 64 input, 64 output ✔
D. 32 input, 32 output

Correct answer: C. 64 input, 64 output

8. What type of power supply is typically used for a PLC?

A. AC
B. DC
C. Both AC and DC ✔
D. Solar

Correct answer: C. Both AC and DC

9. When ___________ contacts are actuated, they disrupt the power supply through them.

A. normally open type
B. normally closed type ✔
C. normally open and closed type
D. none of the mentioned

Correct answer: B. normally closed type

10. Normally open contacts are open

A. when input is not energized ✔
B. when input is energized
C. when input is higher than 20 volts
D. none of the mentioned

Correct answer: A. when input is not energized

11. The type of memory which is fast and temporarily stores the data which are immediately required for use is called as______

A. ROM
B. HDD
C. RAM ✔
D. SSD

Correct answer: C. RAM

12. How is the speed of operation of the conventional relay system compared to digital controllers?

A. Same
B. Almost similar
C. Very slow ✔
D. Very fast

Correct answer: C. Very slow

13. What is the largest integer number that a PLC counter function can reach if it uses a 16 bit register?

A. 32,768
B. 65,535 ✔
C. 65,536
D. 65,537

Correct answer: B. 65,535

14. An OR function implemented in ladder logic uses:

A. Normally-closed contacts in series
B. A single normally-closed contact
C. Normally-open contacts in series
D. Normally-open contacts in parallel ✔

Correct answer: D. Normally-open contacts in parallel

15. A good application for a timed interrupt in a PLC program would be:

A. A communications function block
B. A PID function block ✔
C. A math function block
D. A motor start/stop rung

Correct answer: B. A PID function block

16. What is the main function of the CPU in a PLC?

A. To communicate with other PLCs
B. To provide power to the PLC
C. To execute the program and control the input and output devices ✔
D. To store the program

Correct answer: C. To execute the program and control the input and output devices

17. How does a PLC differ from a traditional hardwired control system?

A. PLCs use software programming instead of physical wiring. ✔
B. PLCs can only be used in industrial applications.
C. PLCs are more expensive than traditional hardwired control systems.
D. PLCs are less reliable than traditional hardwired control systems.

Correct answer: A. PLCs use software programming instead of physical wiring.

18. What is the function of the input/output (I/O) module in a PLC?

A. To provide power to the PLC
B. To store the program
C. To interface with the input and output devices ✔
D. To communicate with other PLCs

Correct answer: C. To interface with the input and output devices

19. The capability of convention relay systems for complex operations is ___________ that of the PLCs.

A. excellent than
B. poor than ✔
C. as good as
D. unpredictable as

Correct answer: B. poor than

20. PLC can be ___________ in plant to change the sequence of operation.

A. only programmed
B. only reprogrammed
C. programmed and reprogrammed ✔
D. able to give a set point

Correct answer: C. programmed and reprogrammed

21. PLC stands for:

A. Process Level Control
B. Programmable Logic Controller ✔
C. Personal Logic Computer
D. Power Line Circuit

Correct answer: B. Programmable Logic Controller

22. A PLC is mainly used for:

A. Word processing
B. Automating industrial machines and processes ✔
C. Web design
D. Photo editing

Correct answer: B. Automating industrial machines and processes

23. The PLC scan cycle consists of:

A. Reading inputs, executing the program and updating outputs ✔
B. Only reading inputs
C. Only writing outputs
D. Printing reports

Correct answer: A. Reading inputs, executing the program and updating outputs

24. Ladder logic is:

A. A graphical PLC programming language resembling relay circuits ✔
B. A database language
C. A spreadsheet formula
D. A web language

Correct answer: A. A graphical PLC programming language resembling relay circuits

25. IEC 61131-3 defines:

A. Robot safety only
B. CNC codes
C. Electrical wiring colours
D. Standard PLC programming languages ✔

Correct answer: D. Standard PLC programming languages

Questions 26 to 50

26. PLC languages under IEC 61131-3 include:

A. G-code and M-code
B. Python and Java only
C. Ladder Diagram, Function Block Diagram, Structured Text, Instruction List and SFC ✔
D. HTML and CSS

Correct answer: C. Ladder Diagram, Function Block Diagram, Structured Text, Instruction List and SFC

27. A normally open (NO) contact in ladder logic:

A. Passes power when false
B. Passes power when the associated input is true ✔
C. Always passes power
D. Never passes power

Correct answer: B. Passes power when the associated input is true

28. A normally closed (NC) contact in ladder logic:

A. Passes power only when true
B. Passes power when the associated input is false ✔
C. Is an output
D. Is a timer

Correct answer: B. Passes power when the associated input is false

29. A coil in ladder logic represents:

A. A timer preset only
B. An input
C. A comment
D. An output or internal bit ✔

Correct answer: D. An output or internal bit

30. A seal-in (latching) circuit:

A. Counts parts
B. Keeps an output on after a momentary start button is released ✔
C. Measures temperature
D. Turns outputs off instantly

Correct answer: B. Keeps an output on after a momentary start button is released

31. A TON timer:

A. Counts pulses
B. Resets counters
C. Turns on its output after a preset delay when enabled ✔
D. Turns off after delay

Correct answer: C. Turns on its output after a preset delay when enabled

32. A TOF timer:

A. Counts up
B. Compares values
C. Keeps the output on for a delay after the input turns off ✔
D. Delays turning on

Correct answer: C. Keeps the output on for a delay after the input turns off

33. A counter (CTU) in a PLC:

A. Reads analogue values
B. Increments each time its input transitions true ✔
C. Measures time
D. Controls motors directly

Correct answer: B. Increments each time its input transitions true

34. Digital inputs to a PLC include:

A. Push buttons, limit switches and proximity sensors ✔
B. Temperature transmitters only
C. Variable speed drives
D. Displays

Correct answer: A. Push buttons, limit switches and proximity sensors

35. Analogue inputs commonly use signals such as:

A. Only Wi-Fi
B. 4-20 mA or 0-10 V ✔
C. Only Ethernet
D. Only on/off

Correct answer: B. 4-20 mA or 0-10 V

36. The 4-20 mA standard uses 4 mA as:

A. An error always
B. No signal
C. The live zero to detect wire breaks ✔
D. Full scale

Correct answer: C. The live zero to detect wire breaks

37. A sinking input and sourcing input describe:

A. Colours of wires
B. The direction of current flow in DC input circuits ✔
C. Network types
D. Programming languages

Correct answer: B. The direction of current flow in DC input circuits

38. HMI stands for:

A. Host Machine Internet
B. Hardware Monitor Integration
C. High Memory Input
D. Human Machine Interface ✔

Correct answer: D. Human Machine Interface

39. SCADA systems are used to:

A. Supervise and control industrial processes over large areas ✔
B. Design websites
C. Edit documents
D. Play games

Correct answer: A. Supervise and control industrial processes over large areas

40. Common industrial communication protocols include:

A. Modbus, PROFINET and EtherNet/IP ✔
B. HDMI
C. HTTP and SMTP only
D. Bluetooth audio

Correct answer: A. Modbus, PROFINET and EtherNet/IP

41. A VFD (Variable Frequency Drive) controls:

A. Only PLC memory
B. The speed of an AC motor by varying frequency ✔
C. Only valves
D. Only lights

Correct answer: B. The speed of an AC motor by varying frequency

42. A relay is:

A. A PLC program
B. A motor
C. A sensor
D. An electrically operated switch ✔

Correct answer: D. An electrically operated switch

43. A contactor is used for:

A. Switching high-current loads such as motors ✔
B. Displaying alarms
C. Measuring temperature
D. Programming PLCs

Correct answer: A. Switching high-current loads such as motors

44. An emergency stop circuit should be:

A. Hard-wired and fail-safe ✔
B. Only in software
C. Optional
D. Disabled during maintenance

Correct answer: A. Hard-wired and fail-safe

45. Lockout/tagout procedures are used to:

A. Ensure machines are safely de-energised during maintenance ✔
B. Speed up production
C. Program PLCs
D. Calibrate sensors

Correct answer: A. Ensure machines are safely de-energised during maintenance

46. PID control stands for:

A. Proportional, Integral, Derivative ✔
B. Program, Interface, Device
C. Position, Inertia, Drive
D. Power, Input, Data

Correct answer: A. Proportional, Integral, Derivative

47. The integral term in PID helps to:

A. Increase noise
B. Eliminate steady-state error ✔
C. Disable control
D. Predict future error only

Correct answer: B. Eliminate steady-state error

48. The derivative term in PID responds to:

A. The rate of change of error ✔
B. Accumulated past error
C. Only setpoint
D. Only output

Correct answer: A. The rate of change of error

49. Open-loop control:

A. Does not use feedback ✔
B. Uses feedback continuously
C. Requires sensors
D. Is always more accurate

Correct answer: A. Does not use feedback

50. Closed-loop control:

A. Ignores feedback
B. Uses feedback to correct output ✔
C. Is always manual
D. Never uses sensors

Correct answer: B. Uses feedback to correct output

Questions 51 to 75

51. A proximity sensor detects:

A. Only temperature
B. Objects without physical contact ✔
C. Only sound
D. Only pressure

Correct answer: B. Objects without physical contact

52. An encoder measures:

A. Humidity
B. Temperature
C. Light colour
D. Position or speed of rotation ✔

Correct answer: D. Position or speed of rotation

53. A robot is:

A. A computer virus
B. A programmable machine capable of performing tasks automatically ✔
C. A database
D. Only a toy

Correct answer: B. A programmable machine capable of performing tasks automatically

54. An industrial robot arm’s joints are often described by:

A. Pixel count
B. Colour
C. Degrees of freedom ✔
D. Battery size

Correct answer: C. Degrees of freedom

55. Common industrial robot types include:

A. Only flying
B. Only wheeled
C. Articulated, SCARA, delta and Cartesian ✔
D. Only humanoid

Correct answer: C. Articulated, SCARA, delta and Cartesian

56. SCARA robots are well suited for:

A. Fast pick-and-place and assembly in a horizontal plane ✔
B. Space travel
C. Underwater exploration
D. Heavy welding in all directions only

Correct answer: A. Fast pick-and-place and assembly in a horizontal plane

57. Collaborative robots (cobots) are designed to:

A. Operate without sensors
B. Work only in cages
C. Work safely alongside humans ✔
D. Replace all workers

Correct answer: C. Work safely alongside humans

58. The end effector of a robot is:

A. The tool at the end of the arm, such as a gripper ✔
B. The power supply
C. The base
D. The controller

Correct answer: A. The tool at the end of the arm, such as a gripper

59. Forward kinematics calculates:

A. Motor current
B. Joint angles from position
C. Battery life
D. The end-effector position from joint angles ✔

Correct answer: D. The end-effector position from joint angles

60. Inverse kinematics calculates:

A. Speed only
B. Mass
C. End-effector position from angles
D. Joint angles needed to reach a target position ✔

Correct answer: D. Joint angles needed to reach a target position

61. A teach pendant is used to:

A. Weld metal
B. Display videos
C. Charge batteries
D. Program and jog robots manually ✔

Correct answer: D. Program and jog robots manually

62. Robot sensors include:

A. Only printers
B. Cameras, lidar, force sensors and encoders ✔
C. Only keyboards
D. Only speakers

Correct answer: B. Cameras, lidar, force sensors and encoders

63. Lidar measures distance using:

A. Heat only
B. Laser light ✔
C. Magnetism
D. Sound only

Correct answer: B. Laser light

64. SLAM in mobile robotics is used for:

A. Welding
B. Painting robots
C. Charging
D. Building a map while tracking the robot’s position ✔

Correct answer: D. Building a map while tracking the robot’s position

65. ROS stands for:

A. Robot Operating System ✔
B. Robotic Output Signal
C. Remote Operation Software
D. Rapid Object Sensor

Correct answer: A. Robot Operating System

66. Stepper motors are useful because they:

A. Cannot be positioned
B. Move in precise fixed steps ✔
C. Need no driver
D. Only spin freely

Correct answer: B. Move in precise fixed steps

67. Servo motors provide:

A. No feedback
B. Precise position control using feedback ✔
C. Only constant speed
D. Only heating

Correct answer: B. Precise position control using feedback

68. CNC stands for:

A. Computer Numerical Control ✔
B. Controlled Nozzle Cutting
C. Computer Network Connection
D. Central Network Computer

Correct answer: A. Computer Numerical Control

69. CNC machines are used to:

A. Write documents
B. Print photos
C. Browse the web
D. Automatically control machining tools such as lathes and mills ✔

Correct answer: D. Automatically control machining tools such as lathes and mills

70. G-code is:

A. A database query
B. The programming language commanding CNC machine motion ✔
C. A PLC ladder language
D. A web language

Correct answer: B. The programming language commanding CNC machine motion

71. G00 typically commands:

A. Program end
B. Circular interpolation
C. Rapid positioning ✔
D. Linear cutting feed

Correct answer: C. Rapid positioning

72. G01 typically commands:

A. Rapid move
B. Linear interpolation at feed rate ✔
C. Spindle on
D. Coolant off

Correct answer: B. Linear interpolation at feed rate

73. G02 and G03 command:

A. Rapid moves
B. Circular interpolation clockwise and counter-clockwise ✔
C. Dwell
D. Tool changes

Correct answer: B. Circular interpolation clockwise and counter-clockwise

74. M-codes in CNC control:

A. Only motion
B. Only feeds
C. Miscellaneous machine functions like spindle and coolant ✔
D. Only comments

Correct answer: C. Miscellaneous machine functions like spindle and coolant

75. M03 typically means:

A. Spindle on clockwise ✔
B. Program end
C. Spindle stop
D. Coolant on

Correct answer: A. Spindle on clockwise

Questions 76 to 100

76. M30 typically means:

A. Spindle start
B. Program end and rewind ✔
C. Tool change
D. Coolant on

Correct answer: B. Program end and rewind

77. Feed rate in CNC is:

A. Tool length
B. Coolant flow
C. Spindle speed
D. The speed at which the tool moves through the material ✔

Correct answer: D. The speed at which the tool moves through the material

78. Spindle speed is measured in:

A. Kilograms
B. RPM (revolutions per minute) ✔
C. Volts
D. Metres

Correct answer: B. RPM (revolutions per minute)

79. Work offset (e.g. G54) defines:

A. Tool length only
B. Spindle speed
C. Coolant level
D. The program zero relative to machine coordinates ✔

Correct answer: D. The program zero relative to machine coordinates

80. Tool length offset compensates for:

A. Workpiece weight
B. Different tool lengths ✔
C. Coolant flow
D. Program errors

Correct answer: B. Different tool lengths

81. A CNC lathe is used mainly for:

A. Painting
B. Welding
C. Milling flat surfaces only
D. Turning cylindrical parts ✔

Correct answer: D. Turning cylindrical parts

82. A CNC milling machine uses:

A. Lasers only
B. A rotating workpiece only
C. Water only
D. A rotating cutter to remove material ✔

Correct answer: D. A rotating cutter to remove material

83. CAM software is used to:

A. Draw sketches only
B. Generate toolpaths and G-code from CAD models ✔
C. Manage payroll
D. Run PLCs

Correct answer: B. Generate toolpaths and G-code from CAD models

84. Dry run or simulation before machining helps to:

A. Skip setup
B. Detect collisions and program errors ✔
C. Damage tools
D. Increase scrap

Correct answer: B. Detect collisions and program errors

85. Cutting fluid (coolant) helps to:

A. Reduce heat and improve tool life and finish ✔
B. Increase friction
C. Slow production
D. Damage parts

Correct answer: A. Reduce heat and improve tool life and finish

86. Machine safety guards protect operators from:

A. Network attacks
B. Data loss
C. Software bugs
D. Moving parts, chips and coolant ✔

Correct answer: D. Moving parts, chips and coolant

87. Preventive maintenance helps to:

A. Reduce unplanned downtime ✔
B. Increase breakdowns
C. Avoid inspections
D. Remove sensors

Correct answer: A. Reduce unplanned downtime

88. Industry 4.0 refers to:

A. Only manual labour
B. Smart manufacturing using connected systems, data and automation ✔
C. Only paper records
D. Only steam engines

Correct answer: B. Smart manufacturing using connected systems, data and automation

89. OEE stands for:

A. Output Error Estimate
B. Operational Energy Efficiency
C. Overall Equipment Effectiveness ✔
D. Online Equipment Exchange

Correct answer: C. Overall Equipment Effectiveness

90. OEE combines:

A. Input, output and waste
B. Availability, performance and quality ✔
C. Cost, time and scope
D. Speed, size and colour

Correct answer: B. Availability, performance and quality

91. A safety PLC is designed for:

A. Safety-critical functions with redundancy ✔
B. Office tasks
C. Gaming
D. Web hosting

Correct answer: A. Safety-critical functions with redundancy

92. Ladder logic rungs are executed:

A. Bottom to top
B. Randomly
C. Only once at startup
D. From top to bottom, left to right during each scan ✔

Correct answer: D. From top to bottom, left to right during each scan

93. Simulation software for PLCs lets engineers:

A. Test programs without real hardware ✔
B. Weld metal
C. Fabricate parts
D. Print labels

Correct answer: A. Test programs without real hardware

94. Documentation of PLC programs should include:

A. Comments, tag descriptions and I/O lists ✔
B. Only passwords
C. Only colours
D. Nothing

Correct answer: A. Comments, tag descriptions and I/O lists

95. The main purpose of industrial automation is to:

A. Increase manual work
B. Replace electricity
C. Avoid measurements
D. Improve productivity, quality and safety through controlled machines ✔

Correct answer: D. Improve productivity, quality and safety through controlled machines

96. A photoelectric sensor detects objects using:

A. Weight
B. Magnetism only
C. A light beam ✔
D. Sound only

Correct answer: C. A light beam

97. A solenoid valve is used to:

A. Measure distance
B. Display alarms
C. Store programs
D. Control the flow of fluid electrically ✔

Correct answer: D. Control the flow of fluid electrically

98. Pneumatic systems use:

A. Electricity only
B. Hydraulic oil only
C. Steam only
D. Compressed air to create motion ✔

Correct answer: D. Compressed air to create motion

99. Hydraulic systems use:

A. Magnets only
B. Compressed air only
C. Light
D. Pressurised fluid to generate force ✔

Correct answer: D. Pressurised fluid to generate force

100. A limit switch is used to:

A. Detect the end of travel of a moving part ✔
B. Store data
C. Display text
D. Control temperature

Correct answer: A. Detect the end of travel of a moving part

How to Pass the PLC Programming Certiication Exam

  • Read every question carefully; most options look similar, so look for the most precise answer.
  • Revise the questions above topic by topic rather than memorising letters, because option order can change in the live test.
  • You need 80 correct answers out of 100 to pass, so aim to understand at least 85 to stay safe.
  • If you do not clear it on the first attempt, review the questions you missed and use the retake option.

Frequently Asked Questions

How many questions are in the PLC Programming Certiication exam?

The exam has 100 multiple-choice questions, each worth 1 mark.

What is the passing score for the PLC Programming Certiication?

You need at least 80% (80 out of 100) to pass and receive the certificate.

Can I retake the PLC Programming Certiication exam?

Yes. If you score below 80%, you can retry the test after reviewing the topics.

Is the Itronix certificate verifiable?

Yes. Every certificate issued by Itronix Solutions has a unique ID that can be checked on the Itronix verify-certificate page.

More Engineering & CAD Certification Answers

Disclaimer: These answers are provided for learning and revision. Questions and answers are checked regularly; if you find a mistake, let us know in the comments.

About Priya Dogra

Priya Dogra runs priyadogra.com, where she shares free certification courses, internships, jobs, scholarships and exam preparation guides for Indian students and freshers. Follow her on YouTube, LinkedIn and Instagram for the latest opportunities.

Check Also

Unix/ Linux Certification exam answers 2026

Unix/ Linux Certification Exam Answers 2026 (All 100 Questions)

All 100 Unix/ Linux Certification exam questions with correct answers highlighted - updated 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *