Scrum Master Professional Certification Exam Answers 2026 (All 100 Questions)

Scrum Master Professional Certification exam answers 2026: This page lists all 100 questions of the official Scrum Master Professional Certification exam by Itronix Solutions, each with its four answer options and the correct answer highlighted in green. Use it to revise every topic before you attempt the test and earn your verifiable certificate.

About this certification: Some of the responsibilities of the scrum master include planning each sprint, managing the Scrum tool and sprint reviews, eliminating blockers, and reporting.

Certification Scrum Master Professional Certification
Provider Itronix Solutions
Category Business, Finance & MBA
Total questions 100 multiple-choice questions
Marks 1 mark per question (100 marks)
Passing score 80% (80 out of 100)
Retake Available if you do not pass
Certificate Verifiable online certificate

Take the exam: Scrum Master Professional Certification on Itronix Solutions. See every other Itronix exam in our complete list of Itronix certification answers.

Scrum Master Exam Questions and Answers

Questions 1 to 25

1. Scrum is best described as:

A. A lightweight framework for complex problems ✔
B. An easy-to-use software development methodology
C. A software development process for large teams to follow
D. An Agile approach to software development

Correct answer: A. A lightweight framework for complex problems

2. Which of the following is not one of the three pillars of Scrum?

A. inspection
B. honesty ✔
C. adaptation
D. transparency

Correct answer: B. honesty

3. Scrum defines three artifacts that represent work or value. Which of the following is not a Scrum artifact?

A. The sprint backlog
B. The increment
C. The deployment ✔
D. The product backlog

Correct answer: C. The deployment

4. Which of the following is not one of the Scrum values?

A. commitment
B. courage
C. focus
D. dignity ✔

Correct answer: D. dignity

5. Which of the following is not a Scrum-defined team role or accountability?

A. project manager ✔
B. product owner
C. Scrum Master
D. developers

Correct answer: A. project manager

6. When is a Sprint over?

A. When all the tasks are completed.
B. When the time-box expires. ✔
C. When the Product Owner says it is done.
D. When all Product Backlog items meet their definition of “Done”.

Correct answer: B. When the time-box expires.

7. What is the recommended size for a Scrum Team?

A. 9
B. Minimum of 7.
C. Typically, 10 or fewer people ✔
D. 7 plus or minus 2

Correct answer: C. Typically, 10 or fewer people

8. Upon what type of process control is Scrum based?

A. Complex
B. Hybrid
C. Defined
D. Empirical ✔

Correct answer: D. Empirical

9. If Waterfall is plan driven, then Scrum is_______

A. Business value driven ✔
B. Client driven
C. PO driven
D. none of the above

Correct answer: A. Business value driven

10. What is the ideal sprint length?

A. 6 weeks
B. 1 – 4 weeks ✔
C. 1 – 2 months
D. 3 months

Correct answer: B. 1 – 4 weeks

11. Which of these isn’t a sprint event?

A. Sprint Planning
B. Daily Stand Up
C. Sprint Review
D. Sprint Closure ✔

Correct answer: D. Sprint Closure

12. Which of the following activity is not timeboxed?

A. Sprint Review
B. Sprint Retrospective
C. Product Backlog Refinement ✔
D. Sprint

Correct answer: C. Product Backlog Refinement

13. Involving the team in Planning and Estimating and providing early feedback on Delivery Velocity is BEST used to mitigate what kind of risk?

A. Schedule flaws ✔
B. Requirements creep
C. Employee turnover
D. Poor productivity

Correct answer: A. Schedule flaws

14. Which of the following is the BEST approach for estimation?

A. Expert opinion
B. Disaggregation
C. Analogy
D. A combination of all of the above ✔

Correct answer: D. A combination of all of the above

15. When forming an Agile project team it is BEST to use:

A. Highly specialized developers
B. Generalized Specialists ✔
C. Top management officials
D. All of the above

Correct answer: B. Generalized Specialists

16. What is the unit of measurement that is used to measure the size of a user story for an Agile project?

A. Work breakdown points
B. Velocity points
C. Story points ✔
D. Function points

Correct answer: C. Story points

17. A person who makes decision and practices Scrum to the core is performing what role?

A. Pig ✔
B. Chicken
C. Scrum Master
D. Scrum Team

Correct answer: A. Pig

18. Who can be the best user proxy?

A. ScrumMaster
B. Customers ✔
C. Agile coach
D. Developer

Correct answer: B. Customers

19. Wireframes and prototypes are widely used as part of?

A. High-level design
B. . Detailed design
C. Empirical design ✔
D. None of the above

Correct answer: C. Empirical design

20. What is NOT an Agile methodology?

A. Extreme programming (XP)
B. Scrum
C. Crystal Clear
D. . PMBOK® 3 ✔

Correct answer: D. . PMBOK® 3

21. The Scrum Master is best described as:

A. The product owner’s assistant only
B. The team’s boss
C. A true leader who serves the Scrum Team and the wider organisation ✔
D. The project accountant

Correct answer: C. A true leader who serves the Scrum Team and the wider organisation

22. The Scrum Master is accountable for:

A. Setting the product vision
B. Delivering all features personally
C. The Scrum Team’s effectiveness ✔
D. Approving budgets

Correct answer: C. The Scrum Team’s effectiveness

23. A key Scrum Master stance is:

A. Coaching the team toward self-management ✔
B. Avoiding the team
C. Assigning tasks daily
D. Making all decisions

Correct answer: A. Coaching the team toward self-management

24. When the team asks the Scrum Master to decide technical design, a good Scrum Master:

A. Facilitates the team to decide for themselves ✔
B. Asks the CEO
C. Ignores the request
D. Decides alone

Correct answer: A. Facilitates the team to decide for themselves

25. The Scrum Master helps the Product Owner by:

A. Setting priorities
B. Writing the backlog for them
C. Finding techniques for effective Product Goal definition and backlog management ✔
D. Approving releases

Correct answer: C. Finding techniques for effective Product Goal definition and backlog management

Questions 26 to 50

26. The Scrum Master helps the organisation by:

A. Managing payroll
B. Hiring developers
C. Writing contracts
D. Leading, training and coaching Scrum adoption ✔

Correct answer: D. Leading, training and coaching Scrum adoption

27. Facilitation means:

A. Talking the most
B. Taking minutes only
C. Helping a group achieve its goal with a clear, effective process ✔
D. Making the decision

Correct answer: C. Helping a group achieve its goal with a clear, effective process

28. During the Daily Scrum, the Scrum Master:

A. Assigns tasks
B. Approves progress
C. Runs it and asks status questions
D. Ensures it happens and is time-boxed, but Developers run it ✔

Correct answer: D. Ensures it happens and is time-boxed, but Developers run it

29. If the Daily Scrum turns into a status report to managers, the Scrum Master should:

A. Encourage it
B. Report to HR
C. Coach the team on its purpose of inspecting progress toward the Sprint Goal ✔
D. Cancel Scrum

Correct answer: C. Coach the team on its purpose of inspecting progress toward the Sprint Goal

30. An impediment is:

A. A backlog item
B. A metric
C. Anything that blocks the team’s progress ✔
D. A user story

Correct answer: C. Anything that blocks the team’s progress

31. The Scrum Master’s role with impediments is to:

A. Blame the team
B. Cause their removal, often by enabling the team or organisation ✔
C. Ignore them
D. Hide them

Correct answer: B. Cause their removal, often by enabling the team or organisation

32. Conflict within the team should be handled by:

A. Facilitating constructive dialogue and helping the team resolve it ✔
B. Firing members
C. Taking sides
D. Ignoring it

Correct answer: A. Facilitating constructive dialogue and helping the team resolve it

33. Psychological safety helps teams to:

A. Stop collaborating
B. Hide mistakes
C. Raise problems and experiment without fear ✔
D. Avoid feedback

Correct answer: C. Raise problems and experiment without fear

34. Servant leadership means:

A. Avoiding responsibility
B. Micromanaging
C. Commanding the team
D. Putting the team’s needs first and enabling their growth ✔

Correct answer: D. Putting the team’s needs first and enabling their growth

35. Coaching differs from mentoring in that coaching:

A. Is optional for Scrum Masters
B. Uses questions to help others find their own answers ✔
C. Is only technical
D. Always gives answers

Correct answer: B. Uses questions to help others find their own answers

36. Teaching as a Scrum Master involves:

A. Explaining Scrum theory, values and practices ✔
B. Writing code for the team
C. Doing performance reviews
D. Approving holidays

Correct answer: A. Explaining Scrum theory, values and practices

37. Powerful questions in coaching are:

A. Unrelated
B. Open-ended and thought-provoking ✔
C. Yes/no only
D. Leading and judgmental

Correct answer: B. Open-ended and thought-provoking

38. The Scrum Master should protect the team from:

A. Unnecessary interruptions and external pressure during the Sprint ✔
B. The Product Owner
C. Customer feedback
D. All stakeholders always

Correct answer: A. Unnecessary interruptions and external pressure during the Sprint

39. Who decides how many items are selected for a Sprint?

A. Stakeholders
B. The CEO
C. The Developers ✔
D. The Scrum Master

Correct answer: C. The Developers

40. Who can change the Sprint Backlog during the Sprint?

A. Only stakeholders
B. The Developers, as more is learned ✔
C. Nobody
D. Only the Scrum Master

Correct answer: B. The Developers, as more is learned

41. The Sprint Goal can be changed during the Sprint:

A. Only by the Scrum Master
B. Yes, any time
C. Only by stakeholders
D. No; the scope may be clarified but the goal stays ✔

Correct answer: D. No; the scope may be clarified but the goal stays

42. A Sprint is cancelled only when:

A. A member is sick
B. The team is tired
C. The Sprint Goal becomes obsolete, by the Product Owner’s decision ✔
D. A meeting is missed

Correct answer: C. The Sprint Goal becomes obsolete, by the Product Owner’s decision

43. The Sprint Retrospective is facilitated so the team can:

A. Demo features
B. Identify improvements to quality and effectiveness ✔
C. Report to management
D. Assign blame

Correct answer: B. Identify improvements to quality and effectiveness

44. Retrospective formats include:

A. Budget reports
B. Code reviews
C. Start-Stop-Continue, 4Ls and Sailboat ✔
D. Gantt charts

Correct answer: C. Start-Stop-Continue, 4Ls and Sailboat

45. Action items from retrospectives should be:

A. Owned by the Scrum Master only
B. Many and vague
C. Ignored
D. Few, specific and followed up ✔

Correct answer: D. Few, specific and followed up

46. The Scrum Master ensures Scrum events are:

A. Optional
B. Long
C. Skipped when busy
D. Held, positive, productive and within the time-box ✔

Correct answer: D. Held, positive, productive and within the time-box

47. For a one-month Sprint, Sprint Planning is time-boxed to:

A. 8 hours ✔
B. 2 hours
C. 1 day plus
D. Unlimited

Correct answer: A. 8 hours

48. For a two-week Sprint, Sprint Planning is usually:

A. 8 hours
B. Up to 4 hours ✔
C. 15 minutes
D. 2 days

Correct answer: B. Up to 4 hours

49. Scrum Masters encourage transparency by:

A. Avoiding boards
B. Hiding risks
C. Private reporting
D. Making work, impediments and progress visible ✔

Correct answer: D. Making work, impediments and progress visible

50. The Definition of Done is created by:

A. Stakeholders only
B. HR
C. The Scrum Team, or the organisation’s standards if they exist ✔
D. The Scrum Master alone

Correct answer: C. The Scrum Team, or the organisation’s standards if they exist

Questions 51 to 75

51. A Scrum Master can also be:

A. A Developer on the team in some cases ✔
B. The CEO
C. The Product Owner always
D. Never part of the team

Correct answer: A. A Developer on the team in some cases

52. Measuring team performance should focus on:

A. Hours worked
B. Individual blame
C. Lines of code
D. Outcomes, value delivered and continuous improvement ✔

Correct answer: D. Outcomes, value delivered and continuous improvement

53. Using velocity as a performance target often leads to:

A. Better accuracy
B. Happier teams
C. Inflated estimates and gaming ✔
D. More value

Correct answer: C. Inflated estimates and gaming

54. Burn-down charts help the team to:

A. Rank individuals
B. Plan holidays
C. Visualise remaining work toward the Sprint Goal ✔
D. Calculate salaries

Correct answer: C. Visualise remaining work toward the Sprint Goal

55. When a stakeholder asks a Developer to add work mid-Sprint, the Scrum Master should:

A. Accept it immediately
B. Redirect the request to the Product Owner ✔
C. Cancel the Sprint
D. Ignore the stakeholder

Correct answer: B. Redirect the request to the Product Owner

56. Scaling Scrum across multiple teams requires:

A. Separate products for each team
B. No integration
C. Multiple Product Owners for one product
D. One Product Backlog and coordination on a single Increment ✔

Correct answer: D. One Product Backlog and coordination on a single Increment

57. Nexus and LeSS are:

A. Retrospective games
B. Estimation methods
C. Frameworks for scaling Scrum ✔
D. Testing tools

Correct answer: C. Frameworks for scaling Scrum

58. Organisational impediments may include:

A. Rigid approval processes and siloed departments ✔
B. Fast feedback
C. Too much collaboration
D. Clear goals

Correct answer: A. Rigid approval processes and siloed departments

59. The Scrum Master helps remove organisational impediments by:

A. Ignoring them
B. Escalating blame
C. Hiring more managers
D. Working with leadership to change policies and structures ✔

Correct answer: D. Working with leadership to change policies and structures

60. Self-managing teams internally decide:

A. Who does what, when and how ✔
B. Company strategy
C. Product vision
D. Their salaries

Correct answer: A. Who does what, when and how

61. Cross-functional teams have:

A. No developers
B. Only one specialty
C. External dependencies for everything
D. All skills needed to create value each Sprint ✔

Correct answer: D. All skills needed to create value each Sprint

62. Team size in Scrum is typically:

A. Exactly 5
B. At least 20
C. 10 or fewer people ✔
D. Unlimited

Correct answer: C. 10 or fewer people

63. Tuckman’s model stages are:

A. Start, stop, continue
B. Forming, storming, norming, performing and adjourning ✔
C. Plan, do, check, act
D. Hire, train, retain

Correct answer: B. Forming, storming, norming, performing and adjourning

64. A Scrum Master during the storming stage should:

A. Assign blame
B. Avoid intervening
C. Help the team work through conflict constructively ✔
D. Disband the team

Correct answer: C. Help the team work through conflict constructively

65. The Scrum Master should avoid:

A. Becoming the team’s task manager or secretary ✔
B. Removing impediments
C. Coaching
D. Facilitating

Correct answer: A. Becoming the team’s task manager or secretary

66. Agile metrics like cycle time help the team to:

A. Avoid planning
B. Punish slow members
C. Set salaries
D. Understand flow and improve predictability ✔

Correct answer: D. Understand flow and improve predictability

67. Working agreements are:

A. HR policies
B. Team-defined norms for collaboration ✔
C. Employment contracts
D. Customer contracts

Correct answer: B. Team-defined norms for collaboration

68. Definition of Ready, if used, helps:

A. Delay all work
B. Remove refinement
C. Ensure backlog items are clear enough to start ✔
D. Replace the Definition of Done

Correct answer: C. Ensure backlog items are clear enough to start

69. Backlog refinement typically uses:

A. Only the Scrum Master’s time
B. No time
C. Up to about 10% of the Developers’ capacity ✔
D. 50% of capacity

Correct answer: C. Up to about 10% of the Developers’ capacity

70. The Scrum Master supports the Product Owner in:

A. Approving budgets
B. Understanding empirical product planning in a complex environment ✔
C. Testing features
D. Writing all user stories

Correct answer: B. Understanding empirical product planning in a complex environment

71. Stakeholder collaboration is facilitated by the Scrum Master through:

A. Email reports only
B. Private meetings only
C. Avoiding stakeholders
D. Well-run Sprint Reviews and removing barriers ✔

Correct answer: D. Well-run Sprint Reviews and removing barriers

72. Empiricism means decisions are based on:

A. Observation and experience ✔
B. Detailed upfront prediction
C. Opinion only
D. Tradition

Correct answer: A. Observation and experience

73. The three pillars of empiricism are:

A. Cost, scope, time
B. Plan, execute, close
C. Design, build, test
D. Transparency, inspection and adaptation ✔

Correct answer: D. Transparency, inspection and adaptation

74. The five Scrum values are:

A. Speed, quality, cost, scope, time
B. None
C. Honesty, loyalty, power, profit, fame
D. Commitment, focus, openness, respect and courage ✔

Correct answer: D. Commitment, focus, openness, respect and courage

75. Courage as a Scrum value means:

A. Doing the right thing and working on tough problems ✔
B. Pleasing everyone
C. Avoiding risks
D. Hiding issues

Correct answer: A. Doing the right thing and working on tough problems

Questions 76 to 100

76. Openness as a Scrum value means:

A. Unlimited meetings
B. Sharing passwords
C. Being open about work and challenges ✔
D. Avoiding feedback

Correct answer: C. Being open about work and challenges

77. Active listening skills for Scrum Masters include:

A. Paraphrasing and asking clarifying questions ✔
B. Multitasking
C. Judging quickly
D. Interrupting

Correct answer: A. Paraphrasing and asking clarifying questions

78. Neutral facilitation means:

A. Taking sides
B. Not steering the group toward the facilitator’s preferred outcome ✔
C. Staying silent always
D. Deciding for the team

Correct answer: B. Not steering the group toward the facilitator’s preferred outcome

79. Liberating Structures are:

A. Facilitation techniques to include everyone’s voice ✔
B. Contracts
C. Org charts
D. Code libraries

Correct answer: A. Facilitation techniques to include everyone’s voice

80. A Scrum Master measuring their success might look at:

A. Reports written
B. Team self-management, delivery of value and continuous improvement ✔
C. Number of meetings run
D. Hours logged

Correct answer: B. Team self-management, delivery of value and continuous improvement

81. Organisational change toward Agile often requires:

A. A single workshop
B. Leadership support, training and patience ✔
C. New tools only
D. Renaming roles only

Correct answer: B. Leadership support, training and patience

82. Agile leadership encourages:

A. Fear
B. Autonomy, mastery and purpose ✔
C. Micromanagement
D. Strict control

Correct answer: B. Autonomy, mastery and purpose

83. Technical excellence supports Scrum by:

A. Increasing debt
B. Enabling sustainable, high-quality Increments ✔
C. Slowing delivery
D. Avoiding Done

Correct answer: B. Enabling sustainable, high-quality Increments

84. A Scrum Master noticing repeated missed Sprint Goals should:

A. Extend Sprints
B. Help the team inspect causes and adapt in the Retrospective ✔
C. Blame individuals
D. Stop Scrum

Correct answer: B. Help the team inspect causes and adapt in the Retrospective

85. Remote Scrum teams benefit from:

A. Longer Sprints only
B. Clear working agreements and good collaboration tools ✔
C. No communication
D. Fewer events

Correct answer: B. Clear working agreements and good collaboration tools

86. Time zones in distributed teams can be addressed by:

A. Mandatory night meetings always
B. Ignoring them
C. Separate products
D. Agreeing overlap hours and asynchronous practices ✔

Correct answer: D. Agreeing overlap hours and asynchronous practices

87. Ethics for Scrum Masters include:

A. Hidden agendas
B. Gossip
C. Favouritism
D. Respect, honesty and confidentiality ✔

Correct answer: D. Respect, honesty and confidentiality

88. Professional Scrum Master (PSM) certification is offered by:

A. Scrum.org ✔
B. PMI
C. Microsoft
D. Google

Correct answer: A. Scrum.org

89. Certified ScrumMaster (CSM) is offered by:

A. Scrum.org
B. Oracle
C. Scrum Alliance ✔
D. AWS

Correct answer: C. Scrum Alliance

90. Continuous improvement means:

A. Only yearly reviews
B. Never changing
C. Changing randomly
D. Regularly inspecting and adapting processes ✔

Correct answer: D. Regularly inspecting and adapting processes

91. The ultimate goal of a Scrum Master is to:

A. Control the team
B. Help the team and organisation deliver value through effective use of Scrum ✔
C. Remove the Product Owner
D. Write all code

Correct answer: B. Help the team and organisation deliver value through effective use of Scrum

92. The Scrum Master is accountable for establishing Scrum as defined in:

A. The Scrum Guide ✔
B. ISO 9001
C. PMBOK only
D. ITIL

Correct answer: A. The Scrum Guide

93. Focus as a Scrum value means:

A. Doing many projects at once
B. Personal goals only
C. Avoiding meetings
D. Concentrating on the Sprint work and Sprint Goal ✔

Correct answer: D. Concentrating on the Sprint work and Sprint Goal

94. Commitment as a Scrum value means:

A. Promising fixed scope always
B. Never changing plans
C. Working overtime
D. Committing to achieving goals and supporting each other ✔

Correct answer: D. Committing to achieving goals and supporting each other

95. Respect as a Scrum value means:

A. Avoiding disagreement
B. Obeying managers blindly
C. Respecting each other as capable, independent people ✔
D. Hiding opinions

Correct answer: C. Respecting each other as capable, independent people

96. A Scrum Master facilitating Sprint Planning ensures:

A. The team leaves with a Sprint Goal and a plan ✔
B. No goal is set
C. Only estimates are made
D. The manager assigns tasks

Correct answer: A. The team leaves with a Sprint Goal and a plan

97. Silent brainstorming helps to:

A. Speed up arguments
B. Avoid ideas
C. Gather ideas from quieter team members ✔
D. Exclude people

Correct answer: C. Gather ideas from quieter team members

98. Dot voting is a technique for:

A. Estimating hours
B. Testing features
C. Prioritising options as a group ✔
D. Writing code

Correct answer: C. Prioritising options as a group

99. Escalating impediments outside the team is appropriate when:

A. Never
B. Always first
C. Only for minor issues
D. The team cannot resolve them itself ✔

Correct answer: D. The team cannot resolve them itself

100. Observation of team dynamics helps the Scrum Master to:

A. Avoid involvement
B. Assign blame
C. Choose the right coaching or facilitation intervention ✔
D. Write reports

Correct answer: C. Choose the right coaching or facilitation intervention

How to Pass the Scrum Master Exam

  • Read every question carefully; most options look similar, so look for the most precise answer.
  • Revise the questions above topic by topic rather than memorising letters, because option order can change in the live test.
  • You need 80 correct answers out of 100 to pass, so aim to understand at least 85 to stay safe.
  • If you do not clear it on the first attempt, review the questions you missed and use the retake option.

Frequently Asked Questions

How many questions are in the Scrum Master Professional Certification exam?

The exam has 100 multiple-choice questions, each worth 1 mark.

What is the passing score for the Scrum Master Professional Certification?

You need at least 80% (80 out of 100) to pass and receive the certificate.

Can I retake the Scrum Master Professional Certification exam?

Yes. If you score below 80%, you can retry the test after reviewing the topics.

Is the Itronix certificate verifiable?

Yes. Every certificate issued by Itronix Solutions has a unique ID that can be checked on the Itronix verify-certificate page.

More Business, Finance & MBA Certification Answers

Disclaimer: These answers are provided for learning and revision. Questions and answers are checked regularly; if you find a mistake, let us know in the comments.

About Priya Dogra

Priya Dogra runs priyadogra.com, where she shares free certification courses, internships, jobs, scholarships and exam preparation guides for Indian students and freshers. Follow her on YouTube, LinkedIn and Instagram for the latest opportunities.

Check Also

Unix/ Linux Certification exam answers 2026

Unix/ Linux Certification Exam Answers 2026 (All 100 Questions)

All 100 Unix/ Linux Certification exam questions with correct answers highlighted - updated 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *