Scrum Foundation Professional Certificate Exam Answers 2026 (All 100 Questions)

Scrum Foundation Professional Certificate exam answers 2026: This page lists all 100 questions of the official Scrum Foundation Professional Certificate exam by Itronix Solutions, each with its four answer options and the correct answer highlighted in green. Use it to revise every topic before you attempt the test and earn your verifiable certificate.

About this certification: The Scrum Foundation Professional Certificate is a professional certification offered by the Itronix Solutions .

Certification Scrum Foundation Professional Certificate
Provider Itronix Solutions
Category Business, Finance & MBA
Total questions 100 multiple-choice questions
Marks 1 mark per question (100 marks)
Passing score 80% (80 out of 100)
Retake Available if you do not pass
Certificate Verifiable online certificate

Take the exam: Scrum Foundation Professional Certificate on Itronix Solutions. See every other Itronix exam in our complete list of Itronix certification answers.

Scrum Foundation Professional Certificate Exam Questions and Answers

Questions 1 to 25

1. What is the primary role of a Scrum Master in a Scrum team?

A. a. Team Manager
B. b. Product Owner
C. c. Facilitator and Servant Leader ✔
D. d. Quality Assurance Lead

Correct answer: C. c. Facilitator and Servant Leader

2. What is the recommended size for a Scrum Development Team?

A. a. 5-10 members
B. b. 15-20 members
C. c. 3-9 members ✔
D. d. No specific recommendation

Correct answer: C. c. 3-9 members

3. In Scrum, who is responsible for prioritizing the Product Backlog?

A. a. Scrum Master
B. b. Development Team
C. c. Product Owner ✔
D. d. Stakeholders

Correct answer: C. c. Product Owner

4. What is the purpose of the Daily Scrum?

A. a. To report progress to stakeholders
B. b. To identify impediments and plan for the next sprint ✔
C. c. To assign tasks to team members
D. d. To review and approve user stories

Correct answer: B. b. To identify impediments and plan for the next sprint

5. Which artifact in Scrum provides transparency on the work done and the work to be done?

A. a. Product Backlog
B. b. Sprint Backlog
C. c. Increment ✔
D. d. Burndown Chart

Correct answer: C. c. Increment

6. What is the time-box for a Sprint Planning meeting in Scrum?

A. a. 1 hour per week
B. b. 2 hours per week
C. c. 4 hours per week ✔
D. d. 8 hours per week

Correct answer: C. c. 4 hours per week

7. What is the purpose of the Sprint Review?

A. a. To plan the next sprint
B. b. To inspect the increment and adapt the Product Backlog ✔
C. c. To inspect the increment and adapt the Sprint Backlog
D. d. To approve the release for deployment

Correct answer: B. b. To inspect the increment and adapt the Product Backlog

8. Who is responsible for managing the progress of work during a Sprint?

A. a. Scrum Master
B. b. Product Owner
C. c. Development Team ✔
D. d. Scrum Team collectively

Correct answer: C. c. Development Team

9. In Scrum, what is the recommended maximum duration for a Sprint?

A. a. 1 week
B. b. 2 weeks ✔
C. c. 3 weeks
D. d. 4 weeks

Correct answer: B. b. 2 weeks

10. What is the purpose of the Sprint Retrospective?

A. a. To review and approve user stories
B. b. To inspect the increment and adapt the Product Backlog
C. c. To improve the team’s processes and performance ✔
D. d. To plan the next sprint

Correct answer: C. c. To improve the team’s processes and performance

11. Who is responsible for making sure that the Development Team understands the items in the Product Backlog?

A. a. Scrum Master
B. b. Product Owner ✔
C. c. Development Team
D. d. Stakeholders

Correct answer: B. b. Product Owner

12. What is the primary purpose of the Scrum framework?

A. a. To deliver a complete product at the end of the project
B. b. To provide a flexible framework for project management ✔
C. c. To control and micromanage team activities
D. d. To maximize the amount of work not done

Correct answer: B. b. To provide a flexible framework for project management

13. What is the role of stakeholders in Scrum?

A. a. They participate in Daily Scrum meetings
B. b. They define the acceptance criteria for user stories
C. c. They provide input and feedback but do not have a defined role ✔
D. d. They are responsible for managing the team’s progress

Correct answer: C. c. They provide input and feedback but do not have a defined role

14. Who is responsible for tracking progress toward the Sprint Goal during a Sprint?

A. a. Scrum Master
B. b. Product Owner
C. c. Development Team ✔
D. d. Scrum Team collectively

Correct answer: C. c. Development Team

15. What is the purpose of the Definition of Done in Scrum?

A. a. To specify the work that should be done during a Sprint
B. b. To define the acceptance criteria for user stories
C. c. To ensure that the increment is potentially releasable ✔
D. d. To assign tasks to team members

Correct answer: C. c. To ensure that the increment is potentially releasable

16. Scrum is best described as:

A. A programming language
B. A testing tool
C. A lightweight framework for solving complex problems through iterative delivery ✔
D. A detailed project plan template

Correct answer: C. A lightweight framework for solving complex problems through iterative delivery

17. Scrum is founded on:

A. Empiricism and lean thinking ✔
B. Heavy documentation
C. Fixed upfront planning
D. Command and control

Correct answer: A. Empiricism and lean thinking

18. The three pillars of empiricism in Scrum are:

A. Planning, control and reporting
B. Transparency, inspection and adaptation ✔
C. Design, build and test
D. Speed, cost and scope

Correct answer: B. Transparency, inspection and adaptation

19. The five Scrum values are:

A. Honesty, loyalty, power, profit and fame
B. Speed, quality, cost, scope and time
C. Commitment, focus, openness, respect and courage ✔
D. Plan, do, check, act and report

Correct answer: C. Commitment, focus, openness, respect and courage

20. The Scrum Team consists of:

A. A project manager and testers only
B. A Product Owner, a Scrum Master and Developers ✔
C. Only developers
D. Stakeholders and sponsors

Correct answer: B. A Product Owner, a Scrum Master and Developers

21. A Scrum Team is typically:

A. Exactly 3 people
B. At least 25 people
C. Unlimited
D. 10 or fewer people ✔

Correct answer: D. 10 or fewer people

22. Scrum Teams are:

A. Organised by job title silos
B. Directed by a project manager daily
C. Temporary for one day
D. Cross-functional and self-managing ✔

Correct answer: D. Cross-functional and self-managing

23. The Product Owner is accountable for:

A. Running daily meetings
B. Writing all the code
C. Maximising the value of the product and managing the Product Backlog ✔
D. Approving holidays

Correct answer: C. Maximising the value of the product and managing the Product Backlog

24. The Scrum Master is accountable for:

A. Owning the budget
B. Writing requirements
C. Assigning tasks to developers
D. Establishing Scrum and the team’s effectiveness ✔

Correct answer: D. Establishing Scrum and the team’s effectiveness

25. Developers are accountable for:

A. Approving releases alone
B. Managing stakeholders only
C. Prioritising the Product Backlog
D. Creating a usable Increment each Sprint ✔

Correct answer: D. Creating a usable Increment each Sprint

Questions 26 to 50

26. How many Product Owners does a Scrum Team have?

A. One per developer
B. None
C. One ✔
D. Two

Correct answer: C. One

27. The Product Owner may delegate work but:

A. Remains accountable ✔
B. Cannot delegate anything
C. Must ask the Scrum Master
D. Loses accountability

Correct answer: A. Remains accountable

28. The Scrum Master serves the Product Owner by:

A. Approving the budget
B. Setting the product vision
C. Helping with effective backlog management techniques ✔
D. Writing the backlog for them

Correct answer: C. Helping with effective backlog management techniques

29. The Scrum Master serves the organisation by:

A. Writing contracts
B. Managing payroll
C. Hiring developers
D. Leading and coaching Scrum adoption ✔

Correct answer: D. Leading and coaching Scrum adoption

30. A Sprint is:

A. A release date
B. An unlimited time period
C. A fixed-length event of one month or less ✔
D. A single meeting

Correct answer: C. A fixed-length event of one month or less

31. Sprints should have:

A. A consistent duration ✔
B. At least three months
C. No end date
D. Variable random lengths

Correct answer: A. A consistent duration

32. A new Sprint starts:

A. Only when management approves
B. Immediately after the previous Sprint ends ✔
C. After a one-week gap
D. Every quarter

Correct answer: B. Immediately after the previous Sprint ends

33. Who can cancel a Sprint?

A. Only the Product Owner ✔
B. The Scrum Master
C. Stakeholders
D. Any developer

Correct answer: A. Only the Product Owner

34. A Sprint might be cancelled if:

A. A developer is ill
B. A meeting is missed
C. The Sprint Goal becomes obsolete ✔
D. The team is tired

Correct answer: C. The Sprint Goal becomes obsolete

35. The Scrum events are:

A. Kick-off, status meeting and closure
B. Design review and code freeze
C. Release party only
D. Sprint, Sprint Planning, Daily Scrum, Sprint Review and Sprint Retrospective ✔

Correct answer: D. Sprint, Sprint Planning, Daily Scrum, Sprint Review and Sprint Retrospective

36. Sprint Planning is time-boxed to a maximum of:

A. Eight hours for a one-month Sprint ✔
B. One hour always
C. Two days
D. No limit

Correct answer: A. Eight hours for a one-month Sprint

37. Sprint Planning addresses:

A. Only bug lists
B. Why the Sprint is valuable, what can be done and how it will be done ✔
C. Only holidays
D. Only the budget

Correct answer: B. Why the Sprint is valuable, what can be done and how it will be done

38. The Sprint Goal is:

A. The team’s salary target
B. The release date
C. A list of all tasks
D. The single objective for the Sprint ✔

Correct answer: D. The single objective for the Sprint

39. The Daily Scrum is time-boxed to:

A. No limit
B. 15 minutes ✔
C. One hour
D. 30 minutes always

Correct answer: B. 15 minutes

40. The purpose of the Daily Scrum is to:

A. Plan the next release
B. Report status to managers
C. Assign blame
D. Inspect progress toward the Sprint Goal and adapt the plan ✔

Correct answer: D. Inspect progress toward the Sprint Goal and adapt the plan

41. Who must participate in the Daily Scrum?

A. Only stakeholders
B. Only the Scrum Master
C. Only the Product Owner
D. The Developers ✔

Correct answer: D. The Developers

42. The Sprint Review is held to:

A. Punish missed work
B. Write documentation only
C. Approve budgets
D. Inspect the outcome of the Sprint and determine future adaptations ✔

Correct answer: D. Inspect the outcome of the Sprint and determine future adaptations

43. The Sprint Review for a one-month Sprint is time-boxed to:

A. Two days
B. Four hours ✔
C. One hour
D. Eight hours

Correct answer: B. Four hours

44. The Sprint Retrospective focuses on:

A. Improving quality and effectiveness of the team ✔
B. Writing user manuals
C. Planning the product roadmap
D. Demonstrating features to customers

Correct answer: A. Improving quality and effectiveness of the team

45. The Sprint Retrospective for a one-month Sprint is time-boxed to:

A. One day
B. Eight hours
C. Three hours ✔
D. 30 minutes

Correct answer: C. Three hours

46. The order of events at the end of a Sprint is:

A. Daily Scrum then Planning
B. Sprint Review then Sprint Retrospective ✔
C. Planning then Review
D. Retrospective then Review

Correct answer: B. Sprint Review then Sprint Retrospective

47. The Scrum artifacts are:

A. Gantt chart, budget and risk log
B. Burn-down chart only
C. Requirements document and test plan
D. Product Backlog, Sprint Backlog and Increment ✔

Correct answer: D. Product Backlog, Sprint Backlog and Increment

48. The commitment for the Product Backlog is:

A. The Definition of Done
B. The Product Goal ✔
C. The release plan
D. The Sprint Goal

Correct answer: B. The Product Goal

49. The commitment for the Sprint Backlog is:

A. The Sprint Goal ✔
B. The velocity
C. The Definition of Done
D. The Product Goal

Correct answer: A. The Sprint Goal

50. The commitment for the Increment is:

A. The Definition of Done ✔
B. The Sprint Goal
C. The burndown
D. The Product Goal

Correct answer: A. The Definition of Done

Questions 51 to 75

51. The Product Backlog is:

A. An emergent, ordered list of what is needed to improve the product ✔
B. A team calendar
C. A list of bugs only
D. A fixed contract

Correct answer: A. An emergent, ordered list of what is needed to improve the product

52. Who orders the Product Backlog?

A. The Product Owner ✔
B. The Developers alone
C. The CEO
D. The Scrum Master

Correct answer: A. The Product Owner

53. Product Backlog refinement means:

A. Deleting the backlog
B. Breaking down and adding detail to backlog items ✔
C. Writing code
D. Testing only

Correct answer: B. Breaking down and adding detail to backlog items

54. The Sprint Backlog is owned by:

A. Stakeholders
B. The Developers ✔
C. The Scrum Master
D. The Product Owner

Correct answer: B. The Developers

55. The Sprint Backlog consists of:

A. The budget
B. The whole Product Backlog
C. Only bugs
D. The Sprint Goal, selected backlog items and a plan for delivery ✔

Correct answer: D. The Sprint Goal, selected backlog items and a plan for delivery

56. An Increment is:

A. A test plan only
B. A concrete stepping stone toward the Product Goal that is usable ✔
C. A partial design document
D. A meeting summary

Correct answer: B. A concrete stepping stone toward the Product Goal that is usable

57. Multiple Increments may be created:

A. Only after release
B. Never
C. Within a single Sprint ✔
D. Only once per year

Correct answer: C. Within a single Sprint

58. The Definition of Done is:

A. A list of tasks
B. A formal description of the state when an Increment meets quality measures ✔
C. The Product Goal
D. The Sprint length

Correct answer: B. A formal description of the state when an Increment meets quality measures

59. If a backlog item does not meet the Definition of Done it:

A. Is marked done
B. Is released anyway
C. Cannot be released or presented at the Sprint Review ✔
D. Is deleted

Correct answer: C. Cannot be released or presented at the Sprint Review

60. Velocity is:

A. A required metric in the Scrum Guide
B. A performance rating for individuals
C. A measure of work completed per Sprint, used for forecasting by the team ✔
D. A Scrum artifact

Correct answer: C. A measure of work completed per Sprint, used for forecasting by the team

61. A burn-down chart shows:

A. Remaining work over time ✔
B. Customer satisfaction
C. Team salaries
D. Code coverage

Correct answer: A. Remaining work over time

62. User stories are commonly written as:

A. Test scripts
B. As a user, I want something so that I get a benefit ✔
C. Only technical specs
D. Contracts

Correct answer: B. As a user, I want something so that I get a benefit

63. Acceptance criteria define:

A. The Sprint length
B. The tech stack
C. The team’s salary
D. Conditions a backlog item must meet to be accepted ✔

Correct answer: D. Conditions a backlog item must meet to be accepted

64. Story points estimate:

A. Number of developers
B. Relative effort or complexity ✔
C. Exact hours
D. Money

Correct answer: B. Relative effort or complexity

65. Planning Poker is a technique for:

A. Retrospectives
B. Hiring
C. Collaborative estimation ✔
D. Gambling

Correct answer: C. Collaborative estimation

66. The Agile Manifesto values individuals and interactions over:

A. Responding to change
B. Working software
C. Processes and tools ✔
D. Customer collaboration

Correct answer: C. Processes and tools

67. The Agile Manifesto values working software over:

A. Responding to change
B. Customer collaboration
C. Comprehensive documentation ✔
D. Individuals

Correct answer: C. Comprehensive documentation

68. The Agile Manifesto values customer collaboration over:

A. Responding to change
B. Working software
C. Contract negotiation ✔
D. Individuals

Correct answer: C. Contract negotiation

69. The Agile Manifesto values responding to change over:

A. Following a plan ✔
B. Individuals
C. Customer collaboration
D. Working software

Correct answer: A. Following a plan

70. How many principles are in the Agile Manifesto?

A. 12 ✔
B. 20
C. 10
D. 4

Correct answer: A. 12

71. Self-managing teams decide:

A. Only their lunch time
B. Nothing
C. Their own salary only
D. Who does what, when and how ✔

Correct answer: D. Who does what, when and how

72. Stakeholders can attend:

A. The Retrospective to judge the team
B. Every Daily Scrum to assign tasks
C. No events
D. The Sprint Review ✔

Correct answer: D. The Sprint Review

73. Impediments are:

A. User stories
B. Backlog items
C. Story points
D. Obstacles that slow the team’s progress ✔

Correct answer: D. Obstacles that slow the team’s progress

74. Removing impediments is mainly facilitated by:

A. The Scrum Master ✔
B. Nobody
C. Stakeholders only
D. The Product Owner only

Correct answer: A. The Scrum Master

75. Technical debt should be:

A. Ignored
B. Hidden from the Product Owner
C. Only fixed at the end
D. Made transparent and managed ✔

Correct answer: D. Made transparent and managed

Questions 76 to 100

76. Scaling Scrum with many teams working on one product requires:

A. No coordination
B. A separate Product Owner per developer
C. Separate products
D. A single Product Backlog and one Product Owner ✔

Correct answer: D. A single Product Backlog and one Product Owner

77. Kanban focuses on:

A. Visualising work and limiting work in progress ✔
B. Fixed-length sprints only
C. Annual planning
D. Heavy documentation

Correct answer: A. Visualising work and limiting work in progress

78. WIP limits help to:

A. Increase work in progress
B. Hide bottlenecks
C. Improve flow and reduce multitasking ✔
D. Remove the board

Correct answer: C. Improve flow and reduce multitasking

79. A Scrum board typically shows:

A. Budgets only
B. Salaries
C. To do, in progress and done columns ✔
D. Org charts

Correct answer: C. To do, in progress and done columns

80. Time-boxing means:

A. Skipping events
B. Extending meetings freely
C. Making events unlimited
D. Setting a maximum duration for an activity ✔

Correct answer: D. Setting a maximum duration for an activity

81. The Product Goal describes:

A. A single bug fix
B. A future state of the product that the team plans against ✔
C. The Sprint length
D. The team’s names

Correct answer: B. A future state of the product that the team plans against

82. Transparency in Scrum requires:

A. Artifacts and progress to be visible to those doing and receiving the work ✔
B. Private backlogs
C. Hiding problems
D. Secret estimates

Correct answer: A. Artifacts and progress to be visible to those doing and receiving the work

83. Inspection in Scrum should be:

A. Done once a year
B. Done only by managers
C. Avoided
D. Frequent and diligent to detect undesirable variances ✔

Correct answer: D. Frequent and diligent to detect undesirable variances

84. Adaptation in Scrum means:

A. Blaming individuals
B. Never changing plans
C. Adjusting the process or product as soon as possible when deviations are found ✔
D. Waiting until the project ends

Correct answer: C. Adjusting the process or product as soon as possible when deviations are found

85. Who participates in Sprint Planning?

A. Only the Product Owner
B. Only the Scrum Master
C. Only managers
D. The entire Scrum Team ✔

Correct answer: D. The entire Scrum Team

86. The Scrum Guide was created by:

A. Kent Beck only
B. W. Edwards Deming
C. Ken Schwaber and Jeff Sutherland ✔
D. Martin Fowler only

Correct answer: C. Ken Schwaber and Jeff Sutherland

87. Scrum works best for:

A. Manufacturing only
B. No projects
C. Simple, fully predictable repetitive work only
D. Complex work where requirements evolve ✔

Correct answer: D. Complex work where requirements evolve

88. A spike is:

A. A time-boxed investigation to reduce uncertainty ✔
B. A stakeholder meeting
C. A production outage
D. A bonus

Correct answer: A. A time-boxed investigation to reduce uncertainty

89. MVP stands for:

A. Minimum Viable Product ✔
B. Maximum Value Plan
C. Managed Version Process
D. Most Valuable Player

Correct answer: A. Minimum Viable Product

90. Release planning in Scrum is:

A. Done by the Scrum Master alone
B. Fixed for years
C. Forbidden
D. Flexible and based on Increments and forecasts ✔

Correct answer: D. Flexible and based on Increments and forecasts

91. The Scrum Master acts as a:

A. Product sponsor
B. Project accountant
C. True leader who serves the Scrum Team and organisation ✔
D. Team boss

Correct answer: C. True leader who serves the Scrum Team and organisation

92. Developers’ skills should be:

A. Sufficient within the team to create value each Sprint ✔
B. Outsourced fully
C. Unrelated to the product
D. Limited to one specialty each

Correct answer: A. Sufficient within the team to create value each Sprint

93. A team that frequently misses its Sprint Goal should:

A. Extend Sprints indefinitely
B. Inspect the causes in the Retrospective and adapt ✔
C. Blame the Product Owner
D. Stop doing Scrum immediately

Correct answer: B. Inspect the causes in the Retrospective and adapt

94. Scrum events are designed to:

A. Be optional
B. Replace all work
C. Add more meetings
D. Create regularity and minimise the need for other meetings ✔

Correct answer: D. Create regularity and minimise the need for other meetings

95. Feedback loops in Scrum help to:

A. Increase cost
B. Delay decisions
C. Reduce risk and improve the product ✔
D. Hide progress

Correct answer: C. Reduce risk and improve the product

96. The main benefit of Scrum is:

A. Delivering value frequently while adapting to change ✔
B. Removing teams
C. Eliminating all planning
D. Guaranteeing fixed scope

Correct answer: A. Delivering value frequently while adapting to change

97. The Scrum Master coaches team members in:

A. Hardware repair
B. Payroll processing
C. Self-management and cross-functionality ✔
D. Legal contracts

Correct answer: C. Self-management and cross-functionality

98. During the Sprint, quality goals should:

A. Be lowered to meet dates
B. Not decrease ✔
C. Be ignored
D. Be set by stakeholders only

Correct answer: B. Not decrease

99. The Product Backlog may be refined:

A. As needed throughout the Sprint ✔
B. Only by managers
C. Only at the end of the project
D. Never

Correct answer: A. As needed throughout the Sprint

100. A Sprint Review is best described as:

A. A retrospective
B. A working session with stakeholders, not just a presentation ✔
C. A formal sign-off meeting only
D. A code review

Correct answer: B. A working session with stakeholders, not just a presentation

How to Pass the Scrum Foundation Professional Certificate Exam

  • Read every question carefully; most options look similar, so look for the most precise answer.
  • Revise the questions above topic by topic rather than memorising letters, because option order can change in the live test.
  • You need 80 correct answers out of 100 to pass, so aim to understand at least 85 to stay safe.
  • If you do not clear it on the first attempt, review the questions you missed and use the retake option.

Frequently Asked Questions

How many questions are in the Scrum Foundation Professional Certificate exam?

The exam has 100 multiple-choice questions, each worth 1 mark.

What is the passing score for the Scrum Foundation Professional Certificate?

You need at least 80% (80 out of 100) to pass and receive the certificate.

Can I retake the Scrum Foundation Professional Certificate exam?

Yes. If you score below 80%, you can retry the test after reviewing the topics.

Is the Itronix certificate verifiable?

Yes. Every certificate issued by Itronix Solutions has a unique ID that can be checked on the Itronix verify-certificate page.

More Business, Finance & MBA Certification Answers

Disclaimer: These answers are provided for learning and revision. Questions and answers are checked regularly; if you find a mistake, let us know in the comments.

About Priya Dogra

Priya Dogra runs priyadogra.com, where she shares free certification courses, internships, jobs, scholarships and exam preparation guides for Indian students and freshers. Follow her on YouTube, LinkedIn and Instagram for the latest opportunities.

Check Also

Unix/ Linux Certification exam answers 2026

Unix/ Linux Certification Exam Answers 2026 (All 100 Questions)

All 100 Unix/ Linux Certification exam questions with correct answers highlighted - updated 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *