Wednesday , November 18 2026
Breaking News

Agile Scrum Foundation Certification Exam Answers 2026 (All 100 Questions)

Agile Scrum Foundation Certification exam answers 2026: This page lists all 100 questions of the official Agile Scrum Foundation Certification exam by Itronix Solutions, each with its four answer options and the correct answer highlighted in green. Use it to revise every topic before you attempt the test and earn your verifiable certificate.

About this certification: Agile Scrum Foundation is designed to test a professional’s fundamental understanding of agile principles and scrum methodology.

Certification Agile Scrum Foundation Certification
Provider Itronix Solutions
Category Business, Finance & MBA
Total questions 100 multiple-choice questions
Marks 1 mark per question (100 marks)
Passing score 80% (80 out of 100)
Retake Available if you do not pass
Certificate Verifiable online certificate

Take the exam: Agile Scrum Foundation Certification on Itronix Solutions. See every other Itronix exam in our complete list of Itronix certification answers.

Agile Scrum Foundation Exam Questions and Answers

Questions 1 to 25

1. Which of the following is delivered at the end of the Sprint?

A. An increment of Done software ✔
B. Wireframes designs for User Interface
C. A document containing test cases for the current sprint
D. An architectural design of the solution

Correct answer: A. An increment of Done software

2. Product Backlog should be ordered on the basis of?

A. The risk associated with the items
B. Value of the items being delivered ✔
C. The complexity of the items being delivered
D. Size of the items being delivered

Correct answer: B. Value of the items being delivered

3. In an Agile environment, what is the main responsibility of a tester?

A. Create automation scripts
B. Finding bugs
C. There is no role as a Tester in Scrum ✔
D. Send test execution reports to the stakeholders

Correct answer: C. There is no role as a Tester in Scrum

4. When is a Sprint Retrospective ceremony performed?

A. Whenever needed
B. Whenever the Product Owner suggests
C. Whenever the Scrum Master suggests
D. At the end of each Sprint ✔

Correct answer: D. At the end of each Sprint

5. What is agile methodology?

A. Agile methodology is an iterative approach to software development. ✔
B. Agile methodology is a circular approach to software development.
C. Agile methodology is a prototype approach to software development.
D. Agile methodology is a sequential approach to software development.

Correct answer: A. Agile methodology is an iterative approach to software development.

6. How much time does each iteration in agile methodology take?

A. 2-3 weeks
B. 1-4 weeks ✔
C. 1-2 months
D. 1-2 weeks

Correct answer: B. 1-4 weeks

7. Does agile methodology ask user’s feedback?

A. Yes ✔
B. No

Correct answer: A. Yes

8. Which of the following are the responsibilities of a Scrum master role in agile methodology?

A. Scrum master is responsible for planning meetings regularly.
B. Scrum master is responsible for planning meetings regularly.
C. Scrum master helps other members included in the project to work with agile methodology.
D. All of the above. ✔

Correct answer: D. All of the above.

9. Who is responsible for defining features, managing input from end-users and managing stakeholders?

A. Product Owner ✔
B. Development Team
C. Scrum Master
D. All of the above

Correct answer: A. Product Owner

10. Who should necessarily attend the Daily Standup meeting?

A. The Scrum Team
B. The Development Team ✔
C. The Scrum Team and the Stakeholders
D. The Development Team and the Product Owner

Correct answer: B. The Development Team

11. When can a Sprint be canceled?

A. The Sprint items are no longer needed
B. Sprint can never be canceled
C. Whenever the Product Owner says ✔
D. Information required to start the development is not available

Correct answer: C. Whenever the Product Owner says

12. How is Product Backlog Arranged?

A. Newer stories prioritized on top, followed by older stories
B. Newer stories prioritized on top, followed by older stories
C. Large items at the top, small items at the bottom
D. High priority items on top, followed by low priority items ✔

Correct answer: D. High priority items on top, followed by low priority items

13. Involving the team in Planning and Estimating and providing early feedback on Delivery Velocity is BEST used to mitigate what kind of risk?

A. Schedule flaws ✔
B. Requirements creep
C. Employee turnover
D. Poor productivity

Correct answer: A. Schedule flaws

14. Involving the team in Planning and Estimating and providing early feedback on Delivery Velocity is BEST used to mitigate what kind of risk?

A. Schedule flaws ✔
B. Requirements creep
C. Employee turnover
D. Poor productivity

Correct answer: A. Schedule flaws

15. Which of the following is the BEST approach for estimation?

A. Expert opinion
B. A combination of all of the above ✔
C. Disaggregation
D. Analogy

Correct answer: B. A combination of all of the above

16. When forming an Agile project team it is BEST to use:

A. Highly specialized developers
B. Disaggregation
C. Generalized Specialists ✔
D. Top management officials

Correct answer: C. Generalized Specialists

17. What is the unit of measurement that is used to measure the size of a user story for an Agile project?

A. Work breakdown points
B. Velocity points
C. Function points
D. Story points ✔

Correct answer: D. Story points

18. Which of the following is a key goal of Agile testing?

A. To provide rapid and continuous feedback ✔
B. To perform comprehensive testing at the end of the development process
C. To ensure that all requirements are met
D. To eliminate all defects from the final product

Correct answer: A. To provide rapid and continuous feedback

19. Which of the following is a key benefit of incorporating testing into the development process early on?

A. Reduced need for test automation
B. Faster time to market ✔
C. Increased collaboration between teams
D. Lower development costs

Correct answer: B. Faster time to market

20. Which of the following is a common challenge of Agile testing?

A. Lack of communication between testing and development teams
B. Over-reliance on manual testing
C. Difficulty in adapting to changes in requirements ✔
D. A focus on comprehensive documentation over working software

Correct answer: C. Difficulty in adapting to changes in requirements

21. Agile is best described as:

A. A fixed project plan
B. A mindset and set of values for iterative, collaborative delivery ✔
C. A testing technique
D. A single software tool

Correct answer: B. A mindset and set of values for iterative, collaborative delivery

22. The Agile Manifesto was written in:

A. 1980
B. 2010
C. 1995
D. 2001 ✔

Correct answer: D. 2001

23. The Agile Manifesto contains:

A. 7 principles only
B. 10 values
C. 4 values and 12 principles ✔
D. 3 rules

Correct answer: C. 4 values and 12 principles

24. An Agile principle states the highest priority is to:

A. Write documentation
B. Minimise meetings
C. Follow the plan
D. Satisfy the customer through early and continuous delivery of valuable software ✔

Correct answer: D. Satisfy the customer through early and continuous delivery of valuable software

25. Agile welcomes changing requirements:

A. Only before the project starts
B. Only with a contract change
C. Even late in development ✔
D. Never

Correct answer: C. Even late in development

Questions 26 to 50

26. Working software is delivered frequently, preferring:

A. Daily documentation
B. Yearly releases
C. Shorter timescales of weeks rather than months ✔
D. One final release

Correct answer: C. Shorter timescales of weeks rather than months

27. Agile emphasises face-to-face conversation because it is:

A. The only option
B. Faster than code
C. The most efficient and effective way to convey information ✔
D. Required by law

Correct answer: C. The most efficient and effective way to convey information

28. The primary measure of progress in Agile is:

A. Hours worked
B. Documents written
C. Meetings held
D. Working software (or a valuable increment) ✔

Correct answer: D. Working software (or a valuable increment)

29. Sustainable pace means:

A. Working overtime always
B. Sprinting without rest
C. Teams can maintain a constant pace indefinitely ✔
D. Slowing down at the end

Correct answer: C. Teams can maintain a constant pace indefinitely

30. Simplicity in Agile is described as:

A. Using simple tools only
B. The art of maximising the amount of work not done ✔
C. Avoiding planning
D. Writing as much code as possible

Correct answer: B. The art of maximising the amount of work not done

31. Self-organising teams produce:

A. Chaos
B. Only documentation
C. Slower delivery
D. The best architectures, requirements and designs ✔

Correct answer: D. The best architectures, requirements and designs

32. Regular reflection in Agile means:

A. Manager-only reviews
B. The team reflects on how to become more effective and adjusts ✔
C. Never changing
D. Annual reviews only

Correct answer: B. The team reflects on how to become more effective and adjusts

33. Iterative development means:

A. Only planning
B. Never revisiting work
C. Building in repeated cycles, refining each time ✔
D. Building everything at once

Correct answer: C. Building in repeated cycles, refining each time

34. Incremental development means:

A. Delivering only at the end
B. Delivering the product in small usable pieces ✔
C. Delivering documentation only
D. Random delivery

Correct answer: B. Delivering the product in small usable pieces

35. Common Agile frameworks include:

A. ITIL only
B. Waterfall and PRINCE2 only
C. Six Sigma only
D. Scrum, Kanban, XP and SAFe ✔

Correct answer: D. Scrum, Kanban, XP and SAFe

36. Scrum uses fixed-length iterations called:

A. Phases
B. Epochs
C. Sprints ✔
D. Stages

Correct answer: C. Sprints

37. Kanban uses:

A. Fixed sprints always
B. A visual board and WIP limits to manage flow ✔
C. No visualisation
D. Gantt charts only

Correct answer: B. A visual board and WIP limits to manage flow

38. Kanban does not prescribe:

A. Limiting WIP
B. Fixed roles or time-boxed sprints ✔
C. Visualising work
D. Managing flow

Correct answer: B. Fixed roles or time-boxed sprints

39. Lead time in Kanban measures:

A. Number of team members
B. Story points
C. Time from request to delivery ✔
D. Time spent in meetings

Correct answer: C. Time from request to delivery

40. Cycle time in Kanban measures:

A. Time from starting work to completion ✔
B. Sprint length
C. Time from request only
D. Velocity

Correct answer: A. Time from starting work to completion

41. A cumulative flow diagram shows:

A. Work items in each state over time ✔
B. Code coverage
C. Burn-up of budget
D. Team salaries

Correct answer: A. Work items in each state over time

42. Extreme Programming (XP) practices include:

A. Annual releases
B. Pair programming, TDD and continuous integration ✔
C. Heavy documentation
D. No testing

Correct answer: B. Pair programming, TDD and continuous integration

43. Pair programming involves:

A. Two projects
B. Two developers working together at one workstation ✔
C. Working alone
D. Two teams competing

Correct answer: B. Two developers working together at one workstation

44. Continuous integration means:

A. Avoiding tests
B. Integrating once a year
C. Manual builds only
D. Integrating code frequently with automated builds and tests ✔

Correct answer: D. Integrating code frequently with automated builds and tests

45. Refactoring in XP means:

A. Adding features
B. Rewriting requirements
C. Deleting tests
D. Improving code design without changing behaviour ✔

Correct answer: D. Improving code design without changing behaviour

46. Lean principles applied to Agile include:

A. Eliminating waste and delivering fast ✔
B. Longer feedback loops
C. Increasing inventory
D. Adding more process

Correct answer: A. Eliminating waste and delivering fast

47. Waste in Lean software development includes:

A. Testing
B. Partially done work, extra features and waiting ✔
C. Customer feedback
D. Working software

Correct answer: B. Partially done work, extra features and waiting

48. SAFe stands for:

A. Simple Agile Feature Engineering
B. Secure Application Framework
C. Scaled Agile Framework ✔
D. Structured Agile Flow

Correct answer: C. Scaled Agile Framework

49. Scaling frameworks such as SAFe and LeSS help:

A. Coordinate many Agile teams on large products ✔
B. Replace Scrum entirely always
C. Single developers only
D. Remove all planning

Correct answer: A. Coordinate many Agile teams on large products

50. A Product Owner in Scrum is responsible for:

A. Coding every feature
B. Approving holidays
C. Maximising product value and managing the Product Backlog ✔
D. Running HR

Correct answer: C. Maximising product value and managing the Product Backlog

Questions 51 to 75

51. A Scrum Master is responsible for:

A. Helping the team and organisation use Scrum effectively ✔
B. Owning the budget
C. Assigning tasks
D. Writing requirements

Correct answer: A. Helping the team and organisation use Scrum effectively

52. Developers in Scrum are responsible for:

A. Managing stakeholders only
B. Prioritising the backlog alone
C. Approving the budget
D. Creating a usable Increment each Sprint ✔

Correct answer: D. Creating a usable Increment each Sprint

53. The Daily Scrum is time-boxed to:

A. 1 hour
B. 2 hours
C. 15 minutes ✔
D. 30 minutes always

Correct answer: C. 15 minutes

54. The Sprint Retrospective focuses on:

A. How the team can improve its way of working ✔
B. Planning the release
C. Demonstrating the product
D. Writing reports

Correct answer: A. How the team can improve its way of working

55. The Sprint Review focuses on:

A. Code style
B. Team conflicts only
C. Individual performance
D. Inspecting the Increment with stakeholders and adapting the backlog ✔

Correct answer: D. Inspecting the Increment with stakeholders and adapting the backlog

56. A user story should follow INVEST, meaning:

A. Integrated, Numeric, Visible, Exact, Static, Timely
B. Independent, Negotiable, Valuable, Estimable, Small and Testable ✔
C. Important, New, Valid, Exact, Simple, Total
D. None

Correct answer: B. Independent, Negotiable, Valuable, Estimable, Small and Testable

57. An epic is:

A. A single small task
B. A meeting
C. A large body of work that can be broken into smaller stories ✔
D. A bug

Correct answer: C. A large body of work that can be broken into smaller stories

58. A theme in Agile planning groups:

A. Related epics or stories around a common goal ✔
B. Bugs only
C. Team members
D. Meetings

Correct answer: A. Related epics or stories around a common goal

59. Story points measure:

A. Exact hours
B. Relative effort, complexity and uncertainty ✔
C. Number of developers
D. Cost in money

Correct answer: B. Relative effort, complexity and uncertainty

60. Planning Poker uses:

A. Real poker chips
B. Cards, often with Fibonacci-like numbers, for team estimation ✔
C. Spreadsheets only
D. Gantt charts

Correct answer: B. Cards, often with Fibonacci-like numbers, for team estimation

61. Velocity helps teams to:

A. Set salaries
B. Forecast how much work they can complete in future iterations ✔
C. Rank teams publicly
D. Compare individuals

Correct answer: B. Forecast how much work they can complete in future iterations

62. Using velocity to compare teams is discouraged because:

A. It improves morale
B. Velocity is always accurate across teams
C. It is required
D. Story points are relative and team-specific ✔

Correct answer: D. Story points are relative and team-specific

63. A burndown chart shows:

A. Customer feedback
B. Team salaries
C. Completed hours only
D. Remaining work decreasing over time ✔

Correct answer: D. Remaining work decreasing over time

64. A burnup chart shows:

A. Defects
B. Remaining tasks only
C. Costs
D. Completed work rising toward the total scope ✔

Correct answer: D. Completed work rising toward the total scope

65. The Definition of Ready describes:

A. Release dates
B. Team rules
C. When a backlog item is ready to be pulled into a Sprint ✔
D. When work is done

Correct answer: C. When a backlog item is ready to be pulled into a Sprint

66. The Definition of Done describes:

A. Team size
B. Backlog order
C. The quality criteria an Increment must meet ✔
D. Sprint length

Correct answer: C. The quality criteria an Increment must meet

67. A Minimum Viable Product is:

A. A marketing plan
B. The smallest product that delivers value and enables learning ✔
C. A prototype that cannot be used
D. A finished product

Correct answer: B. The smallest product that delivers value and enables learning

68. Timeboxing helps teams to:

A. Avoid deadlines
B. Extend meetings
C. Skip planning
D. Focus and limit the time spent on activities ✔

Correct answer: D. Focus and limit the time spent on activities

69. Information radiators are:

A. Highly visible displays of project information like task boards ✔
B. Hidden reports
C. Server logs
D. Email newsletters

Correct answer: A. Highly visible displays of project information like task boards

70. Agile teams are typically:

A. Small, cross-functional and collaborative ✔
B. Large and siloed
C. Managed by committees
D. Individual contributors only

Correct answer: A. Small, cross-functional and collaborative

71. A servant leader:

A. Avoids the team
B. Assigns blame
C. Commands and controls
D. Focuses on enabling and supporting the team ✔

Correct answer: D. Focuses on enabling and supporting the team

72. Psychological safety in teams allows:

A. Blame culture
B. Hiding problems
C. Silence
D. Members to speak up and take risks without fear ✔

Correct answer: D. Members to speak up and take risks without fear

73. Retrospective techniques include:

A. Budget reports
B. Gantt charts
C. Start-Stop-Continue and Mad-Sad-Glad ✔
D. Code reviews only

Correct answer: C. Start-Stop-Continue and Mad-Sad-Glad

74. Technical debt in Agile should be:

A. Hidden
B. Ignored
C. Only fixed at the end
D. Made visible and addressed regularly ✔

Correct answer: D. Made visible and addressed regularly

75. Agile contracts often favour:

A. Rigid fixed scope only
B. No agreements
C. Penalties only
D. Collaboration and flexible scope with fixed time and budget ✔

Correct answer: D. Collaboration and flexible scope with fixed time and budget

Questions 76 to 100

76. Stakeholder engagement in Agile is:

A. Only at project start
B. Only at the end
C. Continuous through reviews and feedback ✔
D. Not needed

Correct answer: C. Continuous through reviews and feedback

77. Hybrid approaches combine:

A. Only Scrum
B. Agile and traditional practices where appropriate ✔
C. Only Waterfall
D. No methods

Correct answer: B. Agile and traditional practices where appropriate

78. Agile is particularly suitable when:

A. No team exists
B. Requirements are fully fixed and simple
C. Requirements are uncertain or likely to change ✔
D. No customer exists

Correct answer: C. Requirements are uncertain or likely to change

79. The Waterfall model differs from Agile because it:

A. Has no planning
B. Follows sequential phases with limited iteration ✔
C. Delivers every two weeks
D. Welcomes change always

Correct answer: B. Follows sequential phases with limited iteration

80. Continuous delivery enables:

A. Manual releases only
B. Releasing only once
C. No testing
D. Releasing to production quickly and safely at any time ✔

Correct answer: D. Releasing to production quickly and safely at any time

81. DevOps complements Agile by:

A. Replacing Scrum
B. Extending collaboration and automation to operations and deployment ✔
C. Avoiding releases
D. Removing developers

Correct answer: B. Extending collaboration and automation to operations and deployment

82. Agile coaching helps organisations to:

A. Avoid change
B. Write code
C. Fire teams
D. Adopt Agile practices and mindset effectively ✔

Correct answer: D. Adopt Agile practices and mindset effectively

83. Impediments are best removed by:

A. Waiting
B. Ignoring them
C. The team with support from the Scrum Master and management ✔
D. Customers only

Correct answer: C. The team with support from the Scrum Master and management

84. Value stream mapping in Agile helps to:

A. Hire staff
B. Plan holidays
C. Identify delays and waste from idea to delivery ✔
D. Design logos

Correct answer: C. Identify delays and waste from idea to delivery

85. OKRs can align Agile teams by:

A. Replacing backlogs
B. Linking objectives and key results to team work ✔
C. Setting salaries
D. Removing goals

Correct answer: B. Linking objectives and key results to team work

86. Agile release trains in SAFe are:

A. Release documents
B. Physical trains
C. Teams of Agile teams delivering together on a cadence ✔
D. Testing tools

Correct answer: C. Teams of Agile teams delivering together on a cadence

87. PI Planning in SAFe is:

A. A code review
B. A big-room planning event aligning multiple teams for a Program Increment ✔
C. A daily stand-up
D. A retrospective

Correct answer: B. A big-room planning event aligning multiple teams for a Program Increment

88. Feedback loops in Agile help to:

A. Hide issues
B. Delay decisions
C. Increase rework
D. Learn quickly and reduce risk ✔

Correct answer: D. Learn quickly and reduce risk

89. Agile metrics should be used to:

A. Set penalties
B. Rank individuals
C. Replace conversations
D. Help teams improve, not to punish individuals ✔

Correct answer: D. Help teams improve, not to punish individuals

90. Spikes are used to:

A. Deliver features
B. Plan holidays
C. Research or reduce uncertainty in a time-boxed way ✔
D. Fix production outages only

Correct answer: C. Research or reduce uncertainty in a time-boxed way

91. Backlog grooming (refinement) involves:

A. Clarifying, estimating and ordering backlog items ✔
B. Releasing
C. Coding
D. Deleting the backlog

Correct answer: A. Clarifying, estimating and ordering backlog items

92. Release planning in Agile is:

A. Adaptive and updated as learning occurs ✔
B. Fixed forever
C. Forbidden
D. Done once by managers

Correct answer: A. Adaptive and updated as learning occurs

93. Customer collaboration in Agile is valued over:

A. Working software
B. Contract negotiation ✔
C. Individuals
D. Responding to change

Correct answer: B. Contract negotiation

94. Individuals and interactions are valued over:

A. Responding to change
B. Processes and tools ✔
C. Working software
D. Customer collaboration

Correct answer: B. Processes and tools

95. Responding to change is valued over:

A. Individuals
B. Customer collaboration
C. Following a plan ✔
D. Working software

Correct answer: C. Following a plan

96. Working software is valued over:

A. Responding to change
B. Customer collaboration
C. Individuals
D. Comprehensive documentation ✔

Correct answer: D. Comprehensive documentation

97. The ultimate goal of Agile is to:

A. Follow fixed plans rigidly
B. Produce more documents
C. Avoid customers
D. Deliver customer value early and continuously while adapting to change ✔

Correct answer: D. Deliver customer value early and continuously while adapting to change

98. Work in progress (WIP) limits help to:

A. Reduce multitasking and expose bottlenecks ✔
B. Hide problems
C. Speed up meetings
D. Increase unfinished work

Correct answer: A. Reduce multitasking and expose bottlenecks

99. Swarming in Agile teams means:

A. Several members collaborating to finish one item quickly ✔
B. Everyone working alone
C. Starting many items
D. Avoiding help

Correct answer: A. Several members collaborating to finish one item quickly

100. The Crystal family of methods emphasises:

A. Fixed phases
B. People, interaction and frequent delivery adapted to team size ✔
C. No communication
D. Heavy documentation

Correct answer: B. People, interaction and frequent delivery adapted to team size

How to Pass the Agile Scrum Foundation Exam

  • Read every question carefully; most options look similar, so look for the most precise answer.
  • Revise the questions above topic by topic rather than memorising letters, because option order can change in the live test.
  • You need 80 correct answers out of 100 to pass, so aim to understand at least 85 to stay safe.
  • If you do not clear it on the first attempt, review the questions you missed and use the retake option.

Frequently Asked Questions

How many questions are in the Agile Scrum Foundation Certification exam?

The exam has 100 multiple-choice questions, each worth 1 mark.

What is the passing score for the Agile Scrum Foundation Certification?

You need at least 80% (80 out of 100) to pass and receive the certificate.

Can I retake the Agile Scrum Foundation Certification exam?

Yes. If you score below 80%, you can retry the test after reviewing the topics.

Is the Itronix certificate verifiable?

Yes. Every certificate issued by Itronix Solutions has a unique ID that can be checked on the Itronix verify-certificate page.

More Business, Finance & MBA Certification Answers

Disclaimer: These answers are provided for learning and revision. Questions and answers are checked regularly; if you find a mistake, let us know in the comments.

About Priya Dogra

Priya Dogra runs priyadogra.com, where she shares free certification courses, internships, jobs, scholarships and exam preparation guides for Indian students and freshers. Follow her on YouTube, LinkedIn and Instagram for the latest opportunities.

Check Also

Unix/ Linux Certification exam answers 2026

Unix/ Linux Certification Exam Answers 2026 (All 100 Questions)

All 100 Unix/ Linux Certification exam questions with correct answers highlighted - updated 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *