Six Sigma Certification exam answers 2026: This page lists all 100 questions of the official Six Sigma Certification exam by Itronix Solutions, each with its four answer options and the correct answer highlighted in green. Use it to revise every topic before you attempt the test and earn your verifiable certificate.

About this certification: Six Sigma is a quality improvement methodology for businesses that counts the number of flaws in a process and aims to systematically fix them.

Certification Six Sigma Certification
Provider Itronix Solutions
Category Business, Finance & MBA
Total questions 100 multiple-choice questions
Marks 1 mark per question (100 marks)
Passing score 80% (80 out of 100)
Retake Available if you do not pass
Certificate Verifiable online certificate

Take the exam: Six Sigma Certification on Itronix Solutions. See every other Itronix exam in our complete list of Itronix certification answers.

Six Sigma Exam Questions and Answers

Questions 1 to 25

1. Six Sigma is applicable to

A. Finance
B. Supply chain
C. Healthcare
D. All of the above ✔

Correct answer: D. All of the above

2. The percentage yield in Six Sigma is

A. 99.38
B. 99.977
C. 99.99966 ✔
D. 93.3

Correct answer: C. 99.99966

3. Poka Yoke means

A. process control
B. mistake proofing ✔
C. standardization
D. none of the above

Correct answer: B. mistake proofing

4. In “DMAIC”, M stands for

A. Measure ✔
B. Method
C. Manpower
D. Machine

Correct answer: A. Measure

5. Which of the following statements best describes Six Sigma?

A. A process improvement methodology ✔
B. A customer satisfaction initiative
C. A human resource management strategy
D. A quality control program

Correct answer: A. A process improvement methodology

6. Which of the following is not a phase of the Six Sigma DMAIC process?

A. Measure
B. Implement ✔
C. Analyze
D. Define

Correct answer: B. Implement

7. What is the primary goal of the Six Sigma methodology?

A. To improve customer satisfaction
B. To reduce costs
C. To reduce defects ✔
D. To increase efficiency

Correct answer: C. To reduce defects

8. Which of the following is an example of a Six Sigma tool used in the Analyze phase?

A. Control chart
B. Process map
C. Ishikawa diagram
D. Pareto chart ✔

Correct answer: D. Pareto chart

9. The process of Six Sigma allows only 3.4 defects per million opportunities.

A. True ✔
B. False

Correct answer: A. True

10. Which of the following is not a six sigma belt level ranking?

A. Yellow Belt
B. Pink Belt ✔
C. Green Belt
D. Black Belt

Correct answer: B. Pink Belt

11. In which among the following is the Six Sigma process not applicable?

A. Supply Chain
B. Healthcare
C. Selecting the best employee of the year ✔
D. Business administration

Correct answer: C. Selecting the best employee of the year

12. The combination of Six Sigma and lean manufacturing is known as ______

A. Lean Three Sigma
B. Lean Sigma
C. Lean Two Sigma
D. Lean Six Sigma ✔

Correct answer: D. Lean Six Sigma

13. Six Sigma projects should be selected from:

A. VOC and VOB ✔
B. Projects where there is a lack of data
C. Projects where the root cause is known
D. Projects that are management “pet projects”

Correct answer: A. VOC and VOB

14. Which of the following statements is NOT true about charting variation?

A. A mean and standard deviation will completely define a normal curve
B. A histogram is sufficient to chart variation ✔
C. Run charts display process performance over time
D. A histogram helps understand process performance

Correct answer: B. A histogram is sufficient to chart variation

15. Validation of root cause is made only when which standard(s) is met:

A. There is a statistically significant relationship between the suspected root cause and the effect.
B. The data is normal
C. Knowledge of the process corroborates this causal relationship.
D. Both A and C above ✔

Correct answer: D. Both A and C above

16. The major purpose of the Control Phase in DMAIC is to:

A. Calculate Cp and Cpk
B. Identify root causes
C. Maintain the gains made with implemented solutions ✔
D. Determine long term solutions

Correct answer: C. Maintain the gains made with implemented solutions

17. A bar chart that depicts the frequencies of numerical or measurement data.

A. Histogram ✔
B. Check Sheet
C. Process Map
D. Sample

Correct answer: A. Histogram

18. A systematic group of activities intended to recognize and evaluate the potential failure of a product/process and the effects of that failure.

A. Six Sigma
B. Failure Mode and Effects Analysis ✔
C. Benchmarking
D. Design of Experiments

Correct answer: B. Failure Mode and Effects Analysis

19. Inputs to a process that can be manipulated during experimentation.

A. Control Plan
B. Population
C. Factors ✔
D. Hypothesis Testing

Correct answer: C. Factors

20. The probability of accepting the alternative hypothesis (H1) when the null hypothesis (Ho) is true.

A. Attribute Data
B. Random Experiment
C. Beta Risk
D. Alpha Risk ✔

Correct answer: D. Alpha Risk

21. Six Sigma is:

A. A data-driven methodology to reduce variation and defects ✔
B. A marketing plan
C. An accounting standard
D. A software package

Correct answer: A. A data-driven methodology to reduce variation and defects

22. Six Sigma quality corresponds to about:

A. 3.4 defects per million opportunities ✔
B. 34 defects per thousand
C. 1 defect per 100
D. Zero measurement

Correct answer: A. 3.4 defects per million opportunities

23. Six Sigma was popularised by:

A. Motorola and later General Electric ✔
B. Apple
C. Microsoft
D. Toyota only

Correct answer: A. Motorola and later General Electric

24. Lean Six Sigma combines:

A. Waste reduction from Lean with variation reduction from Six Sigma ✔
B. Design and sales
C. Marketing and finance
D. HR and payroll

Correct answer: A. Waste reduction from Lean with variation reduction from Six Sigma

25. The DMAIC phases are:

A. Decide, Manage, Act, Implement, Check
B. Design, Make, Inspect, Correct
C. Define, Measure, Analyse, Improve, Control ✔
D. Discover, Map, Act, Improve, Close

Correct answer: C. Define, Measure, Analyse, Improve, Control

Questions 26 to 50

26. DMADV is mainly used for:

A. Designing new processes or products ✔
B. Hiring staff
C. Improving existing processes only
D. Auditing finances

Correct answer: A. Designing new processes or products

27. DFSS stands for:

A. Data for Statistical Studies
B. Design for Six Sigma ✔
C. Design for Sales Success
D. Defects for Small Samples

Correct answer: B. Design for Six Sigma

28. Six Sigma belts include:

A. Gold and Silver
B. White only
C. Yellow, Green, Black and Master Black Belt ✔
D. Red and Blue only

Correct answer: C. Yellow, Green, Black and Master Black Belt

29. A Green Belt typically:

A. Only collects data
B. Owns the company
C. Never uses statistics
D. Leads smaller projects while doing their regular job ✔

Correct answer: D. Leads smaller projects while doing their regular job

30. A Black Belt typically:

A. Only attends training
B. Has no statistical role
C. Only approves budgets
D. Leads complex improvement projects full-time and coaches others ✔

Correct answer: D. Leads complex improvement projects full-time and coaches others

31. A Champion or Sponsor in Six Sigma:

A. Provides resources and removes barriers for projects ✔
B. Operates machines
C. Collects data daily
D. Writes code

Correct answer: A. Provides resources and removes barriers for projects

32. The Define phase produces:

A. Final solutions
B. A project charter with problem statement, scope and goals ✔
C. Training manuals only
D. Control charts

Correct answer: B. A project charter with problem statement, scope and goals

33. A good problem statement is:

A. Solution-focused
B. Blaming individuals
C. Vague and broad
D. Specific, measurable and free of assumed causes or solutions ✔

Correct answer: D. Specific, measurable and free of assumed causes or solutions

34. SIPOC stands for:

A. Scope, Issues, Plan, Outcomes, Checks
B. Sales, Income, Profit, Orders, Costs
C. Systems, Information, People, Operations, Controls
D. Suppliers, Inputs, Process, Outputs, Customers ✔

Correct answer: D. Suppliers, Inputs, Process, Outputs, Customers

35. Voice of the Customer (VOC) captures:

A. Supplier prices
B. Machine logs only
C. Employee schedules
D. Customer needs and expectations ✔

Correct answer: D. Customer needs and expectations

36. Critical to Quality (CTQ) characteristics are:

A. Internal costs only
B. Random metrics
C. Measurable requirements that matter to customers ✔
D. Employee preferences

Correct answer: C. Measurable requirements that matter to customers

37. A CTQ tree translates:

A. Costs into prices
B. Broad customer needs into specific measurable requirements ✔
C. Defects into rewards
D. Data into charts

Correct answer: B. Broad customer needs into specific measurable requirements

38. Kano model categorises requirements into:

A. Basic, performance and delight (excitement) attributes ✔
B. Old and new
C. Cheap and expensive
D. Internal and external only

Correct answer: A. Basic, performance and delight (excitement) attributes

39. The Measure phase focuses on:

A. Writing control plans
B. Closing projects
C. Implementing solutions
D. Establishing the current process baseline with reliable data ✔

Correct answer: D. Establishing the current process baseline with reliable data

40. Operational definitions ensure:

A. Measurements are optional
B. Everyone measures the same thing in the same way ✔
C. Data is hidden
D. Metrics change daily

Correct answer: B. Everyone measures the same thing in the same way

41. Continuous data is:

A. Pass or fail
B. Measured on a scale, such as time or weight ✔
C. Counted categories only
D. Colours

Correct answer: B. Measured on a scale, such as time or weight

42. Discrete (attribute) data is:

A. Measured to decimals
B. Always continuous
C. Time only
D. Counted or categorised, such as defects or pass/fail ✔

Correct answer: D. Counted or categorised, such as defects or pass/fail

43. A defect is:

A. A measurement
B. A process step
C. Any failure to meet a customer requirement ✔
D. Any product made

Correct answer: C. Any failure to meet a customer requirement

44. A defective unit is:

A. A process
B. A sample size
C. A unit with one or more defects ✔
D. A unit with zero defects

Correct answer: C. A unit with one or more defects

45. DPMO stands for:

A. Design Process Management Objective
B. Defects Per Million Opportunities ✔
C. Daily Production Measurement Output
D. Data Per Monthly Order

Correct answer: B. Defects Per Million Opportunities

46. DPU stands for:

A. Data Per User
B. Defects Per Unit ✔
C. Design Per Unit
D. Delivery Per Unit

Correct answer: B. Defects Per Unit

47. First Pass Yield measures:

A. The proportion of units completed correctly the first time ✔
B. Scrap value
C. Rework count
D. Total output

Correct answer: A. The proportion of units completed correctly the first time

48. Rolled Throughput Yield is:

A. The sum of defects
B. The total cost
C. The product of first pass yields of all process steps ✔
D. The average cycle time

Correct answer: C. The product of first pass yields of all process steps

49. Measurement System Analysis (MSA) checks:

A. Supplier prices
B. Customer satisfaction
C. Whether the measurement system is reliable ✔
D. Employee morale

Correct answer: C. Whether the measurement system is reliable

50. Gage R&R evaluates:

A. Repeatability and reproducibility of measurements ✔
B. Revenue and returns
C. Rate and range
D. Risk and reward

Correct answer: A. Repeatability and reproducibility of measurements

Questions 51 to 75

51. Repeatability refers to:

A. Customer variation
B. Supplier variation
C. Variation when the same operator measures the same item repeatedly ✔
D. Variation between operators

Correct answer: C. Variation when the same operator measures the same item repeatedly

52. Reproducibility refers to:

A. Machine age
B. Sample size
C. Variation between different operators measuring the same items ✔
D. Same operator repeating

Correct answer: C. Variation between different operators measuring the same items

53. A Gage R&R below about 10% of total variation is generally:

A. Irrelevant
B. A failure always
C. Unacceptable
D. Acceptable ✔

Correct answer: D. Acceptable

54. Sampling helps by:

A. Measuring every item always
B. Avoiding data
C. Estimating population characteristics without measuring everything ✔
D. Guessing

Correct answer: C. Estimating population characteristics without measuring everything

55. Process capability compares:

A. Staff with machines
B. Sales with targets
C. Process spread with specification limits ✔
D. Cost with price

Correct answer: C. Process spread with specification limits

56. Cp measures:

A. Potential capability assuming the process is centred ✔
B. Defect count
C. Actual mean
D. Cycle time

Correct answer: A. Potential capability assuming the process is centred

57. Cpk measures:

A. Capability considering both spread and centring ✔
B. Only the spread
C. Only the target
D. Only sample size

Correct answer: A. Capability considering both spread and centring

58. A Cpk of 2.0 corresponds roughly to:

A. No capability
B. Six Sigma short-term capability ✔
C. Very poor capability
D. One sigma

Correct answer: B. Six Sigma short-term capability

59. The 1.5 sigma shift accounts for:

A. Long-term drift in process mean ✔
B. Measurement error only
C. Customer demand
D. Sample size

Correct answer: A. Long-term drift in process mean

60. The Analyse phase aims to:

A. Implement controls
B. Write the charter
C. Train staff
D. Identify and verify root causes ✔

Correct answer: D. Identify and verify root causes

61. A fishbone diagram helps to:

A. Calculate capability
B. Plot data over time
C. Brainstorm potential causes by category ✔
D. Monitor stability

Correct answer: C. Brainstorm potential causes by category

62. 5 Whys is used to:

A. Count defects
B. Draw histograms
C. Set control limits
D. Drill down to a root cause by repeatedly asking why ✔

Correct answer: D. Drill down to a root cause by repeatedly asking why

63. A Pareto chart helps to:

A. Measure correlation
B. Define scope
C. Show trends over time
D. Prioritise the vital few causes ✔

Correct answer: D. Prioritise the vital few causes

64. Hypothesis testing is used to:

A. Determine whether observed differences are statistically significant ✔
B. Write charters
C. Guess results
D. Draw process maps

Correct answer: A. Determine whether observed differences are statistically significant

65. The null hypothesis usually states:

A. There is a difference
B. The process is perfect
C. There is no difference or effect ✔
D. The data is wrong

Correct answer: C. There is no difference or effect

66. A p-value below 0.05 typically leads to:

A. Ending the project
B. Collecting no data
C. Rejecting the null hypothesis ✔
D. Accepting the null always

Correct answer: C. Rejecting the null hypothesis

67. A Type I error is:

A. Sampling too much
B. Measuring wrongly
C. Rejecting a true null hypothesis ✔
D. Failing to reject a false null

Correct answer: C. Rejecting a true null hypothesis

68. A Type II error is:

A. Using wrong units
B. Plotting wrongly
C. Rejecting a true null
D. Failing to reject a false null hypothesis ✔

Correct answer: D. Failing to reject a false null hypothesis

69. A t-test compares:

A. Proportions of many groups
B. Categories only
C. Means of one or two groups ✔
D. Variances only

Correct answer: C. Means of one or two groups

70. ANOVA compares:

A. Two proportions only
B. Means across three or more groups ✔
C. Correlation
D. Time series

Correct answer: B. Means across three or more groups

71. A chi-square test is used for:

A. Comparing means
B. Regression slopes
C. Control limits
D. Relationships between categorical variables ✔

Correct answer: D. Relationships between categorical variables

72. Correlation coefficient r ranges from:

A. -1 to +1 ✔
B. 0 to 1 only
C. -10 to 10
D. 0 to 100

Correct answer: A. -1 to +1

73. Regression analysis helps to:

A. Model how inputs (X) affect an output (Y) ✔
B. Count defects only
C. Define customers
D. Draw flowcharts

Correct answer: A. Model how inputs (X) affect an output (Y)

74. Y = f(X) in Six Sigma means:

A. Yield equals frequency
B. Years equal factors
C. Nothing
D. The output is a function of the process inputs ✔

Correct answer: D. The output is a function of the process inputs

75. A value stream map shows:

A. Material and information flow with waste and delays ✔
B. Sales territories
C. Org charts
D. Budgets

Correct answer: A. Material and information flow with waste and delays

Questions 76 to 100

76. The Improve phase focuses on:

A. Developing, testing and implementing solutions to root causes ✔
B. Defining the problem
C. Measuring baseline only
D. Closing the project without change

Correct answer: A. Developing, testing and implementing solutions to root causes

77. Design of Experiments (DOE) helps to:

A. Plot Pareto charts
B. Write SOPs
C. Find the effect of multiple factors and interactions efficiently ✔
D. Avoid data

Correct answer: C. Find the effect of multiple factors and interactions efficiently

78. A full factorial experiment tests:

A. Random guesses
B. All combinations of factor levels ✔
C. Only one level
D. One factor at a time

Correct answer: B. All combinations of factor levels

79. Pilot testing a solution helps to:

A. Increase risk
B. Validate results on a small scale before full rollout ✔
C. Skip validation
D. Avoid data

Correct answer: B. Validate results on a small scale before full rollout

80. Poka-yoke means:

A. Waste removal
B. Visual management
C. Fast changeover
D. Mistake-proofing a process ✔

Correct answer: D. Mistake-proofing a process

81. FMEA is used to:

A. Draw SIPOC
B. Plot data
C. Compute capability
D. Identify and prioritise potential failure modes ✔

Correct answer: D. Identify and prioritise potential failure modes

82. In FMEA, RPN equals:

A. Severity x Occurrence x Detection ✔
B. Cost x Time
C. Price x Volume
D. Defects x Units

Correct answer: A. Severity x Occurrence x Detection

83. 5S workplace organisation includes:

A. None of these
B. Scan, Ship, Sell, Save, Stop
C. Sort, Set in order, Shine, Standardise, Sustain ✔
D. Safety, Speed, Style, Sales, Service

Correct answer: C. Sort, Set in order, Shine, Standardise, Sustain

84. Kaizen events are:

A. Annual audits
B. Sales campaigns
C. Hiring drives
D. Short focused improvement workshops ✔

Correct answer: D. Short focused improvement workshops

85. The Control phase ensures:

A. Data is collected first
B. The problem is defined
C. Improvements are sustained over time ✔
D. The charter is written

Correct answer: C. Improvements are sustained over time

86. A control plan documents:

A. Marketing slogans
B. Salary details
C. Customer names
D. How the process will be monitored and corrected ✔

Correct answer: D. How the process will be monitored and corrected

87. Statistical Process Control (SPC) uses:

A. Gantt charts
B. Pie charts only
C. Org charts
D. Control charts to monitor process stability ✔

Correct answer: D. Control charts to monitor process stability

88. Common cause variation is:

A. Customer complaints
B. Inherent random variation in a stable process ✔
C. Variation from unusual events
D. Always a defect

Correct answer: B. Inherent random variation in a stable process

89. Special cause variation is:

A. Random always
B. Normal background noise
C. Variation from assignable, unusual sources ✔
D. Desired variation

Correct answer: C. Variation from assignable, unusual sources

90. An I-MR chart is used for:

A. Defect counts
B. Subgroup means only
C. Proportions defective
D. Individual continuous measurements ✔

Correct answer: D. Individual continuous measurements

91. An X-bar R chart monitors:

A. Proportions
B. Subgroup means and ranges ✔
C. Counts only
D. Individual values only

Correct answer: B. Subgroup means and ranges

92. A p-chart monitors:

A. Proportion defective ✔
B. Ranges
C. Means
D. Individual values

Correct answer: A. Proportion defective

93. Control limits are calculated from:

A. Management targets
B. Competitor data
C. Customer specifications
D. Process data ✔

Correct answer: D. Process data

94. Standard work and SOPs help to:

A. Remove training
B. Sustain consistent methods after improvement ✔
C. Increase variation
D. Encourage random methods

Correct answer: B. Sustain consistent methods after improvement

95. Visual management makes:

A. Reports longer
B. Data hidden
C. Process status and problems easy to see ✔
D. Work slower

Correct answer: C. Process status and problems easy to see

96. A response plan in the Control phase defines:

A. Actions to take when the process goes out of control ✔
B. Marketing actions
C. Price changes
D. Hiring plans

Correct answer: A. Actions to take when the process goes out of control

97. Project benefits in Six Sigma are often measured as:

A. Cost savings, defect reduction and customer satisfaction ✔
B. Number of slides
C. Number of meetings
D. Office size

Correct answer: A. Cost savings, defect reduction and customer satisfaction

98. Handing over a project to the process owner ensures:

A. The project restarts
B. Ongoing ownership of the improved process ✔
C. The team disbands without documentation
D. Data is deleted

Correct answer: B. Ongoing ownership of the improved process

99. A Six Sigma culture emphasises:

A. One-time fixes only
B. Blame
C. Opinions over data
D. Data-driven decisions and continuous improvement ✔

Correct answer: D. Data-driven decisions and continuous improvement

100. Takt time equals:

A. Total cost divided by units
B. Cycle time times operators
C. Available production time divided by customer demand ✔
D. Lead time minus wait time

Correct answer: C. Available production time divided by customer demand

How to Pass the Six Sigma Exam

  • Read every question carefully; most options look similar, so look for the most precise answer.
  • Revise the questions above topic by topic rather than memorising letters, because option order can change in the live test.
  • You need 80 correct answers out of 100 to pass, so aim to understand at least 85 to stay safe.
  • If you do not clear it on the first attempt, review the questions you missed and use the retake option.

Frequently Asked Questions

How many questions are in the Six Sigma Certification exam?

The exam has 100 multiple-choice questions, each worth 1 mark.

What is the passing score for the Six Sigma Certification?

You need at least 80% (80 out of 100) to pass and receive the certificate.

Can I retake the Six Sigma Certification exam?

Yes. If you score below 80%, you can retry the test after reviewing the topics.

Is the Itronix certificate verifiable?

Yes. Every certificate issued by Itronix Solutions has a unique ID that can be checked on the Itronix verify-certificate page.

More Business, Finance & MBA Certification Answers

Disclaimer: These answers are provided for learning and revision. Questions and answers are checked regularly; if you find a mistake, let us know in the comments.

About Priya Dogra

Priya Dogra runs priyadogra.com, where she shares free certification courses, internships, jobs, scholarships and exam preparation guides for Indian students and freshers. Follow her on YouTube, LinkedIn and Instagram for the latest opportunities.

Check Also

Unix/ Linux Certification exam answers 2026

Unix/ Linux Certification Exam Answers 2026 (All 100 Questions)

All 100 Unix/ Linux Certification exam questions with correct answers highlighted - updated 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *