Project Management Professional Certification Exam Answers 2026 (All 100 Questions)

Project Management Professional Certification exam answers 2026: This page lists all 100 questions of the official Project Management Professional Certification exam by Itronix Solutions, each with its four answer options and the correct answer highlighted in green. Use it to revise every topic before you attempt the test and earn your verifiable certificate.

About this certification: It helps students build the skills needed to work as project managers in various industries with a starting salary of more than $59K per year.

Certification Project Management Professional Certification
Provider Itronix Solutions
Category Business, Finance & MBA
Total questions 100 multiple-choice questions
Marks 1 mark per question (100 marks)
Passing score 80% (80 out of 100)
Retake Available if you do not pass
Certificate Verifiable online certificate

Take the exam: Project Management Professional Certification on Itronix Solutions. See every other Itronix exam in our complete list of Itronix certification answers.

Project Management Exam Questions and Answers

Questions 1 to 25

1. Technological uncertainty of the technologies involved can be mitigated by careful

A. Analysis ✔
B. Error-checking
C. Execution
D. Planning

Correct answer: A. Analysis

2. In first level of priority, the existing projects are of type

A. Immediate-type
B. High-priority ✔
C. lower-priority
D. Random-level priority

Correct answer: B. High-priority

3. Both parties, firm and subcontractors must implement the partnering process with an agreement of

A. 2-part
B. 3-part
C. 4-part ✔
D. 5-part

Correct answer: C. 4-part

4. Risk of scope change caused by increased user knowledge can only be managed by handling the up-front

A. Partnering
B. Networking
C. Innovations
D. Communication ✔

Correct answer: D. Communication

5. Milestones established by the customer must be adhered to by:

A. Project manager
B. Functional managers
C. The customer
D. Both a and b ✔

Correct answer: D. Both a and b

6. The decision to request an increase the resources for a project is the responsibility of the:

A. Customer
B. Functional manager
C. Project manager ✔
D. Director of project management

Correct answer: C. Project manager

7. In which of the following project phases is the project schedule developed?

A. Design
B. Planning ✔
C. Implementation
D. Conceptual

Correct answer: B. Planning

8. To crash a schedule you should:

A. Increase work efforts on those tasks that are on the critical path ✔
B. Replace those worker that are not performing up to par with the busy
C. Try to increase expenditures of time only those tasks that are behind schedule
D. Increase the time allowed on those tasks that have float

Correct answer: A. Increase work efforts on those tasks that are on the critical path

9. What are the five basic parameters of software economics?

A. Size, process, personnel, environment, required quality ✔
B. Size, customer satisfaction, Operating system, environment, and the technology used
C. Model of the project, customer satisfaction, Operating system, environment, and the technology used
D. Process, customer satisfaction, Operating system, environment, and the technology used

Correct answer: A. Size, process, personnel, environment, required quality

10. Choose the correct option which depicts the relationships between the five parameters of software economics?

A. Project=(effort)(environment)(quality)(size)process
B. effort=(personnel)(environment)(quality)(size)process ✔
C. effort=(Process)(environment)(quality)(size)personnel
D. quality=(Process)(environment)(process)(size)personnel

Correct answer: B. effort=(personnel)(environment)(quality)(size)process

11. What is the diseconomy of the scale of software development?

A. The diseconomy of the scale of software development is a result of the process exponent being less than 1
B. The diseconomy of the scale of software development is a result of the process exponent being greater than 1
C. The diseconomy of the scale of software development is a result of the process exponent being greater than 0 ✔
D. The diseconomy of the scale of software development is a result of the process exponent being greater than 1.0

Correct answer: C. The diseconomy of the scale of software development is a result of the process exponent being greater than 0

12. What is the most significant way to improve affordability and return on investment?

A. Producing a product that achieves the design goals
B. Producing a product that achieves the design goals that satisfy the customer
C. Producing a product that achieves the design goals that satisfy the server client
D. Producing a product that achieves the design goals with a minimum amount of human-generated source materials ✔

Correct answer: D. Producing a product that achieves the design goals with a minimum amount of human-generated source materials

13. A project manager communicates primarily through email with her team members, internal and external project stakeholders. Certain techniques are incorporated to ensure there are no misunderstandings. Which of the following is not considered one of these techniques?

A. Communications register ✔
B. Clear purpose directed at meeting the needs of the reader
C. Concise expression
D. Controlled flow of words and ideas

Correct answer: A. Communications register

14. A project manager, while developing the stakeholder register, lists down the potential stakeholders and chooses to use a data gathering method known as brain writing. What is the first thing to do when using this method?

A. Refer to the stakeholder engagement plan to get an understanding of how to identify stakeholders
B. Share a set of questions with participating members ahead of the the creativity session ✔
C. Convene a data gathering meeting with the participants
D. Develop your own template for a stakeholder register

Correct answer: B. Share a set of questions with participating members ahead of the the creativity session

15. You need to establish the relative priorities of risks recognized in a project. Which of the following tasks is the most likely to not affect this prioritization?

A. Researching the stakeholder register
B. Making a review of the assumption log
C. Generating the risk report ✔
D. Examining the risk register

Correct answer: C. Generating the risk report

16. The organization’s leadership wants to include more agile methodologies in their projects. Before starting to take any agile approaches in a project, what is the first thing to be done?

A. Conduct a survey of employees to find those willing to participate in agile projects
B. Conduct agile training for those in the team assembled for the pilot project
C. Put current projects on hold to readjust them to the new agile cadence
D. Evaluate the organizational culture and transformation readiness ✔

Correct answer: D. Evaluate the organizational culture and transformation readiness

17. Which of the following is not a project management goal?

A. Avoiding customer complaints ✔
B. Keeping overall costs within budget
C. Delivering the software to the customer at the agreed time
D. Maintaining a happy and well-functioning development team

Correct answer: A. Avoiding customer complaints

18. What is the first step in project planning?

A. Determine the budget
B. Establish the objectives and scope ✔
C. Inspect the deliverables
D. Determine project constraints

Correct answer: B. Establish the objectives and scope

19. A project is anything which is

A. Not implicitly expressed
B. Not a physical objective
C. Implicitly expressed ✔
D. Social acceptability

Correct answer: C. Implicitly expressed

20. Process framework activities are populated with

A. Milestones
B. QA Points
C. Work Products
D. All of the above ✔

Correct answer: D. All of the above

21. A project is:

A. A permanent department
B. A temporary endeavour to create a unique product, service or result ✔
C. A daily task list
D. An ongoing routine operation

Correct answer: B. A temporary endeavour to create a unique product, service or result

22. Project management is:

A. Only scheduling meetings
B. Applying knowledge, skills, tools and techniques to meet project requirements ✔
C. Only accounting
D. Only hiring

Correct answer: B. Applying knowledge, skills, tools and techniques to meet project requirements

23. The triple constraint includes:

A. Scope, time and cost ✔
B. People, place and price
C. Plan, do and check
D. Risk, quality and tax

Correct answer: A. Scope, time and cost

24. The project manager is responsible for:

A. Leading the team to achieve project objectives ✔
B. Owning the company
C. Approving all budgets alone
D. Writing all code

Correct answer: A. Leading the team to achieve project objectives

25. A project sponsor:

A. Tests deliverables only
B. Writes code
C. Does daily tasks
D. Provides resources and support and champions the project ✔

Correct answer: D. Provides resources and support and champions the project

Questions 26 to 50

26. Stakeholders are:

A. Only shareholders
B. Only customers
C. People or groups affected by or able to influence the project ✔
D. Only the project team

Correct answer: C. People or groups affected by or able to influence the project

27. A stakeholder register lists:

A. Project tasks
B. Stakeholders, their interests and influence ✔
C. Risks only
D. Budget items

Correct answer: B. Stakeholders, their interests and influence

28. The project life cycle typically includes:

A. Hiring, firing and paying
B. Initiating, planning, executing, monitoring and controlling, and closing ✔
C. Design, sale and support
D. Plan, buy and sell

Correct answer: B. Initiating, planning, executing, monitoring and controlling, and closing

29. A project charter:

A. Is a contract with suppliers only
B. Lists daily tasks
C. Is the final report
D. Formally authorises the project and the project manager ✔

Correct answer: D. Formally authorises the project and the project manager

30. The scope statement defines:

A. Office layout
B. Project deliverables, boundaries and acceptance criteria ✔
C. Company strategy
D. The team’s salaries

Correct answer: B. Project deliverables, boundaries and acceptance criteria

31. Scope creep is:

A. A scheduling tool
B. A risk response
C. Uncontrolled expansion of project scope ✔
D. Reducing scope deliberately

Correct answer: C. Uncontrolled expansion of project scope

32. A Work Breakdown Structure (WBS):

A. Is a risk list
B. Is a Gantt chart only
C. Decomposes project work into smaller manageable parts ✔
D. Shows team salaries

Correct answer: C. Decomposes project work into smaller manageable parts

33. A work package is:

A. A contract
B. The lowest level of the WBS ✔
C. The project charter
D. The final deliverable only

Correct answer: B. The lowest level of the WBS

34. A Gantt chart shows:

A. Tasks against a timeline ✔
B. Budget breakdown only
C. Stakeholder influence
D. Risk probability

Correct answer: A. Tasks against a timeline

35. A milestone is:

A. A team member
B. A significant point or event with zero duration ✔
C. A budget item
D. A long task

Correct answer: B. A significant point or event with zero duration

36. The critical path is:

A. The most expensive tasks
B. Optional tasks
C. The longest sequence of dependent tasks determining the minimum duration ✔
D. The shortest path

Correct answer: C. The longest sequence of dependent tasks determining the minimum duration

37. Float (slack) is:

A. Extra budget
B. The time a task can be delayed without delaying the project ✔
C. A quality metric
D. Extra staff

Correct answer: B. The time a task can be delayed without delaying the project

38. A finish-to-start dependency means:

A. No dependency
B. Both finish together
C. Both tasks start together
D. A task cannot start until its predecessor finishes ✔

Correct answer: D. A task cannot start until its predecessor finishes

39. Crashing a schedule means:

A. Adding resources to shorten activity durations ✔
B. Cancelling the project
C. Removing scope
D. Delaying tasks

Correct answer: A. Adding resources to shorten activity durations

40. Fast tracking means:

A. Performing activities in parallel that were planned sequentially ✔
B. Skipping planning
C. Adding more budget only
D. Cutting quality

Correct answer: A. Performing activities in parallel that were planned sequentially

41. PERT estimates use:

A. Random numbers
B. Optimistic, most likely and pessimistic durations ✔
C. Only past costs
D. Only one estimate

Correct answer: B. Optimistic, most likely and pessimistic durations

42. The PERT formula is:

A. (O + P) / 2
B. O x M x P
C. (O + M + P) / 3
D. (O + 4M + P) / 6 ✔

Correct answer: D. (O + 4M + P) / 6

43. Cost estimating predicts:

A. The resources and money needed for the project ✔
B. Tax rates
C. Market share
D. Employee morale

Correct answer: A. The resources and money needed for the project

44. A cost baseline is:

A. The approved time-phased budget ✔
B. The actual cost spent
C. A risk register
D. A team list

Correct answer: A. The approved time-phased budget

45. Earned Value Management (EVM) measures:

A. Project performance against scope, schedule and cost ✔
B. Only team happiness
C. Only risks
D. Only quality

Correct answer: A. Project performance against scope, schedule and cost

46. Planned Value (PV) is:

A. The budgeted cost of work scheduled ✔
B. The earned value
C. The total budget always
D. The actual cost

Correct answer: A. The budgeted cost of work scheduled

47. Earned Value (EV) is:

A. The planned value
B. The budgeted cost of work actually performed ✔
C. The forecast
D. The actual money spent

Correct answer: B. The budgeted cost of work actually performed

48. Actual Cost (AC) is:

A. The cost actually incurred for work performed ✔
B. The budget
C. The earned value
D. The contingency

Correct answer: A. The cost actually incurred for work performed

49. Cost Variance (CV) equals:

A. EV minus AC ✔
B. AC minus EV
C. EV minus PV
D. PV minus EV

Correct answer: A. EV minus AC

50. Schedule Variance (SV) equals:

A. PV minus EV
B. EV minus PV ✔
C. EV minus AC
D. AC minus PV

Correct answer: B. EV minus PV

Questions 51 to 75

51. A CPI below 1 indicates:

A. Under budget
B. The project is over budget ✔
C. Ahead of schedule
D. On schedule

Correct answer: B. The project is over budget

52. An SPI above 1 indicates:

A. Over budget
B. Behind schedule
C. Cancelled
D. The project is ahead of schedule ✔

Correct answer: D. The project is ahead of schedule

53. A risk is:

A. A completed task
B. An uncertain event that may affect project objectives ✔
C. A team member
D. A certain problem

Correct answer: B. An uncertain event that may affect project objectives

54. A risk register records:

A. Team salaries
B. The schedule only
C. Identified risks, analysis and responses ✔
D. Meeting minutes only

Correct answer: C. Identified risks, analysis and responses

55. Qualitative risk analysis assesses:

A. Budget totals
B. Team skills
C. Probability and impact of risks ✔
D. Exact monetary values only

Correct answer: C. Probability and impact of risks

56. Risk response strategies for threats include:

A. Avoid, transfer, mitigate and accept ✔
B. Plan, do, check and act
C. Buy, sell, hold and trade
D. Ignore, delay, hide and deny

Correct answer: A. Avoid, transfer, mitigate and accept

57. Transferring a risk means:

A. Accepting it
B. Ignoring it
C. Shifting its impact to a third party, e.g. through insurance ✔
D. Eliminating it entirely

Correct answer: C. Shifting its impact to a third party, e.g. through insurance

58. An issue is:

A. A risk that has occurred or a current problem ✔
B. A deliverable
C. A future possibility only
D. A milestone

Correct answer: A. A risk that has occurred or a current problem

59. Quality planning identifies:

A. Stakeholder addresses
B. Team holidays
C. Office supplies
D. Quality requirements and how to meet them ✔

Correct answer: D. Quality requirements and how to meet them

60. Quality assurance focuses on:

A. Marketing
B. Hiring
C. Inspecting final products only
D. Processes to prevent defects ✔

Correct answer: D. Processes to prevent defects

61. Quality control focuses on:

A. Budgeting
B. Recruiting
C. Planning processes only
D. Inspecting deliverables to find defects ✔

Correct answer: D. Inspecting deliverables to find defects

62. A RACI matrix defines:

A. Cost categories
B. Who is Responsible, Accountable, Consulted and Informed ✔
C. Risk levels
D. Schedule dates

Correct answer: B. Who is Responsible, Accountable, Consulted and Informed

63. Resource levelling aims to:

A. Ignore constraints
B. Balance resource demand with availability ✔
C. Remove resources
D. Increase overtime always

Correct answer: B. Balance resource demand with availability

64. Communication planning determines:

A. Only risks
B. Only the budget
C. Only quality
D. Who needs what information, when and how ✔

Correct answer: D. Who needs what information, when and how

65. Number of communication channels formula is:

A. n(n – 1) / 2 ✔
B. 2n
C. n squared
D. n – 1

Correct answer: A. n(n – 1) / 2

66. A status report communicates:

A. Only the final result
B. Current progress, issues and next steps ✔
C. Only risks
D. Only costs

Correct answer: B. Current progress, issues and next steps

67. A change request is:

A. An informal chat
B. A formal proposal to modify project baselines ✔
C. A risk response
D. A milestone

Correct answer: B. A formal proposal to modify project baselines

68. A Change Control Board (CCB):

A. Reviews and approves or rejects change requests ✔
B. Manages payroll
C. Tests deliverables
D. Writes code

Correct answer: A. Reviews and approves or rejects change requests

69. Procurement management covers:

A. Hiring internal staff only
B. Risk analysis
C. Quality testing
D. Acquiring goods and services from outside the team ✔

Correct answer: D. Acquiring goods and services from outside the team

70. A fixed-price contract places more cost risk on:

A. The PMO
B. The seller ✔
C. The buyer
D. The sponsor

Correct answer: B. The seller

71. A cost-reimbursable contract places more cost risk on:

A. Nobody
B. The team
C. The buyer ✔
D. The seller

Correct answer: C. The buyer

72. A PMO is:

A. A project manager
B. A Project Management Office that standardises project practices ✔
C. A product owner
D. A procurement order

Correct answer: B. A Project Management Office that standardises project practices

73. Agile project management emphasises:

A. Fixed scope upfront
B. Iterative delivery and adapting to change ✔
C. Annual releases
D. Heavy documentation

Correct answer: B. Iterative delivery and adapting to change

74. Waterfall project management is:

A. An iterative sprint approach
B. A quality method
C. A sequential, phase-based approach ✔
D. A risk tool

Correct answer: C. A sequential, phase-based approach

75. Hybrid approaches combine:

A. Predictive and agile practices ✔
B. No methods
C. Only waterfall
D. Only Scrum

Correct answer: A. Predictive and agile practices

Questions 76 to 100

76. Kanban boards visualise:

A. Budgets only
B. Workflow and work in progress ✔
C. Contracts
D. Salaries

Correct answer: B. Workflow and work in progress

77. Lessons learned are captured to:

A. Increase costs
B. Delay closure
C. Blame team members
D. Improve future projects ✔

Correct answer: D. Improve future projects

78. Project closure includes:

A. Ignoring documentation
B. Obtaining acceptance, releasing resources and archiving records ✔
C. Hiring more staff
D. Starting a new scope

Correct answer: B. Obtaining acceptance, releasing resources and archiving records

79. Tuckman’s stages of team development are:

A. Plan, do, check and act
B. Start, run, stop
C. Hire, train, pay
D. Forming, storming, norming, performing and adjourning ✔

Correct answer: D. Forming, storming, norming, performing and adjourning

80. Conflict resolution by collaborating aims for:

A. One side winning
B. A win-win solution ✔
C. Avoiding the issue
D. Forcing a decision

Correct answer: B. A win-win solution

81. Emotional intelligence helps project managers to:

A. Write contracts
B. Draw Gantt charts
C. Calculate budgets
D. Understand and manage their own and others’ emotions ✔

Correct answer: D. Understand and manage their own and others’ emotions

82. Servant leadership focuses on:

A. Avoiding responsibility
B. Commanding the team strictly
C. Micromanaging
D. Supporting and enabling the team ✔

Correct answer: D. Supporting and enabling the team

83. A project baseline is:

A. The first draft of anything
B. An approved version of scope, schedule or cost used for comparison ✔
C. A defect
D. A risk

Correct answer: B. An approved version of scope, schedule or cost used for comparison

84. Gold plating means:

A. Meeting requirements
B. Adding extra features not requested by the customer ✔
C. Reducing scope
D. Using quality materials

Correct answer: B. Adding extra features not requested by the customer

85. Rolling wave planning means:

A. Planning near-term work in detail and future work at a higher level ✔
B. Planning everything in detail upfront
C. Planning only at the end
D. No planning

Correct answer: A. Planning near-term work in detail and future work at a higher level

86. Assumptions in a project are:

A. Risks that occurred
B. Confirmed facts
C. Contracts
D. Factors considered true without proof for planning ✔

Correct answer: D. Factors considered true without proof for planning

87. Constraints are:

A. Limiting factors such as budget or deadline ✔
B. Optional features
C. Lessons learned
D. Team preferences

Correct answer: A. Limiting factors such as budget or deadline

88. A feasibility study assesses:

A. Team morale
B. Whether a project is viable ✔
C. Lessons learned
D. The final deliverable

Correct answer: B. Whether a project is viable

89. A business case justifies:

A. The office layout
B. The team structure only
C. Why the project is worth investing in ✔
D. The vendor list only

Correct answer: C. Why the project is worth investing in

90. Benefits realisation ensures:

A. Scope expands
B. The project delivers intended business value ✔
C. Only outputs are produced
D. Costs increase

Correct answer: B. The project delivers intended business value

91. Project portfolio management selects:

A. The right mix of projects aligned with strategy ✔
B. Team members only
C. Office supplies
D. Tools only

Correct answer: A. The right mix of projects aligned with strategy

92. A program is:

A. A contract
B. A single task
C. A software product only
D. A group of related projects managed together for benefits ✔

Correct answer: D. A group of related projects managed together for benefits

93. PMP is a certification offered by:

A. PMI (Project Management Institute) ✔
B. IEEE
C. ISO
D. Google only

Correct answer: A. PMI (Project Management Institute)

94. PRINCE2 is:

A. A process-based project management method ✔
B. A risk register
C. A cost formula
D. A programming language

Correct answer: A. A process-based project management method

95. Contingency reserve is used for:

A. Team bonuses
B. Unknown unknowns only
C. Marketing
D. Identified risks ✔

Correct answer: D. Identified risks

96. Management reserve is used for:

A. Profit
B. Identified risks only
C. Unknown, unforeseen work ✔
D. Salaries

Correct answer: C. Unknown, unforeseen work

97. The main goal of project management is to:

A. Maximise paperwork
B. Extend timelines
C. Avoid stakeholders
D. Deliver the intended outcome within agreed constraints ✔

Correct answer: D. Deliver the intended outcome within agreed constraints

98. A kickoff meeting is held to:

A. Approve invoices
B. Close the project
C. Fire staff
D. Align the team and stakeholders at project start ✔

Correct answer: D. Align the team and stakeholders at project start

99. Velocity in agile projects measures:

A. Meeting hours
B. Budget spent
C. Defects found
D. Work completed per iteration ✔

Correct answer: D. Work completed per iteration

100. A burndown chart shows:

A. Remaining work over time ✔
B. Stakeholder influence
C. Vendor list
D. Team salaries

Correct answer: A. Remaining work over time

How to Pass the Project Management Exam

  • Read every question carefully; most options look similar, so look for the most precise answer.
  • Revise the questions above topic by topic rather than memorising letters, because option order can change in the live test.
  • You need 80 correct answers out of 100 to pass, so aim to understand at least 85 to stay safe.
  • If you do not clear it on the first attempt, review the questions you missed and use the retake option.

Frequently Asked Questions

How many questions are in the Project Management Professional Certification exam?

The exam has 100 multiple-choice questions, each worth 1 mark.

What is the passing score for the Project Management Professional Certification?

You need at least 80% (80 out of 100) to pass and receive the certificate.

Can I retake the Project Management Professional Certification exam?

Yes. If you score below 80%, you can retry the test after reviewing the topics.

Is the Itronix certificate verifiable?

Yes. Every certificate issued by Itronix Solutions has a unique ID that can be checked on the Itronix verify-certificate page.

More Business, Finance & MBA Certification Answers

Disclaimer: These answers are provided for learning and revision. Questions and answers are checked regularly; if you find a mistake, let us know in the comments.

About Priya Dogra

Priya Dogra runs priyadogra.com, where she shares free certification courses, internships, jobs, scholarships and exam preparation guides for Indian students and freshers. Follow her on YouTube, LinkedIn and Instagram for the latest opportunities.

Check Also

Unix/ Linux Certification exam answers 2026

Unix/ Linux Certification Exam Answers 2026 (All 100 Questions)

All 100 Unix/ Linux Certification exam questions with correct answers highlighted - updated 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *